My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44908
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44908
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:37 PM
Creation date
11/23/2007 1:24:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
General Documents
Doc Date
7/21/2003
Doc Name
Consent Decree
From
Gold King Mines Corporation
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />~~eiv <br />/ eal <br />GOLD KING MINES CORPORATION.- ~~G~ ~ ~ ?pp3 <br />r.o. BoX z99 <br />Silverton, Colorado 81433 ~ F <br />a <br />~er~ ~~e <br />Telephone (970) 387-5813 Fax (970) 387-5760 C'eo/p9Y <br />July 18, 2003 ~~~€L fi3 <br />Colorado Department of Health & Environment <br />Water Quality Control Division -Assessment Unit t C~^^y s+c~[ ~'^ j / <br />4300 Cherry Creek Drive South -fig - <br />WQCD - Au - B2 ~Vl -1 Q 77' 3 <br />Denver, Colorado 80246-1530 t-c~se~t De`ree <br />ed+ai' P^o ec.~'s <br />M+ne /loan .gin J <br />Attention: Ms. Sarah 7ohnson <br />Re: Engineered Design for Mogul Mine Level No. 1 Tunnel Bulkhead <br />Dear Ms. Johnson: <br />Enclosed is the engineered design for the tunnel bulkhead for the No. 1 level of the Mogul mine. <br />The design was prepared by John F. Abel, Jr. The design follows the same technical analytical <br />methodology utilized by Mr. Abel for the three American Tunnel bulkheads and other bulkheads <br />designed for Sunnyside Gold Corporation for the Sunnyside mine. The design is based on a field <br />inspection of the proposed site by Mr. Abel, Mr. Larry Perino of Sunnyside Gold and myself. We <br />believe the proposed location of the bulkhead represents the best opportunity to curtail drainage from the <br />Mogul mine. We would appreciate the Divisions review and approval of the design as soon as possible <br />so that construction can be completed during the current season. <br />We have submitted a second copy of the design to Mr. Wallace Erickson of the Colorado <br />Division of Minerals and Geology for their review and approval. <br />We look forward to working with the Division on this project. <br />Resp ctfu y, <br />.Q ~'-- <br />Step en C. Fe r ident <br />cc. Larry Perino, Sunnyside Gold Corporation <br />
The URL can be used to link to this page
Your browser does not support the video tag.