Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Depanmeni of Natural Resources <br />1313 Sherman 6L, Room 215 <br />Denver, Colorado 80203 <br />Phone: (4031 866-3567 <br />FAX: 13031 8328106 <br />April 4, 1994 <br />Hr. Larry Reschke <br />Powderhorn Coal Company <br />P.O. Box 1430 <br />Palisade, CO 81526 <br />RE: Roadside & Cameo Mines (C-81-041) <br />Status of Cameo Mine <br />Dear Mr. Reschke, <br />~~~~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCE <br />Roy Romer <br />cnvernor <br />Ken sala tar <br />Exec W rve Dueao~ <br />Michael B Lunp <br />Division Director <br />On the March, 1994 partial inspection, Powderhorn Coal Co. informed the Division <br />that the Cameo Mine would be utilized. Powderhorn indicated that the name of the <br />mine would be changed from "Roadside & Cameo" to "Roadside North Portal & <br />Roadside South Portal". Please submit a minor revision to the Division to <br />formalize the mine name change. <br />In light of the decision by Powderhorn to activate the Cameo mine, the Division <br />researched the permit and files to determine additional information needed. <br />Please note that if Powderhorn Coal intends to do anything significantly <br />different that the approved underground operations presently in the permit, a <br />permit revision is needed. <br />Based on the permit renewal, AHR'e and miecellaneova correspondence for <br />the Roadside and Cameo Mines, Powderhorn Coal Company should monitor one <br />well upgradient from the loadout site and at least one well downgradient <br />from the loadout Bite. Powderhorn Coal Company should submit a technical <br />revision with location, sampling frequency and parameters to the Division <br />by May 30, 1994 as Required by Rule 4.24.4. <br />2. Please update Exhibit 5 titled Mine Plan Life of Ooerationa 5-year mining <br />plan if Powderhorn intends to mine other areas not depicted on the map. <br />If there are no changes to Exhibit 5, a revision to the mine plan is not <br />needed. Please inform the Division if the total affected acres of 2112 by <br />1998 will be increased with the opening of the Cameo Mine. <br />Please note that any exploration drilling or addition of mine facilities <br />will require a revision to the permit. <br />If you have any questions, please do not hesitate to call. <br />Sincerely, <br />~~ S ' C~;~ <br />Erica S. Crosby <br />Environmental Protection Specialist <br />m:\coal\esc\roadside\940404 <br />