My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL44299
DRMS
>
Back File Migration
>
General Documents
>
GENERAL44299
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:13:06 PM
Creation date
11/23/2007 12:57:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
General Documents
Doc Date
1/9/1996
Doc Name
FAX COVER-INFLOW DESIGN FLOOD FOR THE GOLD HILL MILL TAILING POND-COLINA ORO MOLINO INC PN M-94-117
From
DMG
To
RICHARD FOX
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ <br />i i <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmeni of Natural Resources <br />1313 Sherman St., Roum ? 1 5 <br />Dem~er. CuloraAo 802(13 <br />Phone: (3071 R66 3567 <br />FAl (7031 R32-8106 <br />- ~Ta-rF nF COLORADO <br />11111111!llllllllll ~,,~.. <br />~~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />BENT VIA FACSIMILE Roy Romer <br />Governor <br />/~ lames S Lnchhead <br />DATE: January 9, 199 {p Exec nave oner~or <br />Michael B. Long <br />TO: Richard Fox Division oireanr <br />FROM: Allen Sorenson <br />RE: Inflow Design Flood for the Gold Hill Mill Tailing Pond, Colina <br />Oro Molino, Inc., Permit No. M-94-117 <br />Carl Mount notified me that you were inquiring about pond sizing for the <br />Gold Hill Mill. The approved permit for the tailing pond calls for <br />sufficient impoundment capacity to store the sum of: <br />1. A 10 year flood with the initial pond level at its average <br />elevation. <br />2. A flood equal to 40$ of the 100 year flood. <br />3. A 100 year flood. <br />The operator's commitment to this level of pond storage capacity can be <br />found on page 3 of letter dated July 18, 1995 from Thames Hartley to Allen <br />Sorenson. <br />It is my understanding that the operator will be providing a survey of the <br />pond with a determination of the current storage capacity, as well as a <br />hydrologic evaluation of the runoff that would report to the pond during <br />the design storm event. <br />If you have any questions, please contact me. <br />cc: Carl Mount <br />Ric Fanyo, via FAX <br />C:\WP51\GOLDHILL.STR <br />
The URL can be used to link to this page
Your browser does not support the video tag.