Laserfiche WebLink
_r <br /> <br />III III III III IIII III <br />999 <br />RECEIVED <br />JAN 2 51983 <br />MINED LANp ~CL4MATION <br />COLO. DEPT. OF NATURAL RESOURCES <br />Nihj1~-EE3njT---~49L <br />Permi t date .lanuar~l2__+ 198_ Permi t No. _ C-020_81 __ <br />Perm i t txp i rat i on Date ~li3~~2~_, 1988 <br />THIS PERMIT is issued by the Mined Land Reclamation <br />Division, Department of Natural Resources, State of cclorado. <br />R~~jTAL~ <br />1. -Sal#_Cr~eks3.iniugLompa>~_____ ( "operator") desires to <br />conduct a mining operation known as 1`9U~JfER~9HYaP~_ _______________ <br />for the purpose of extracting coal. <br />II. Un _Qt~~Er~ _____, 1982_, the Mined Land Reclamation <br />Division ("the division") approved operator's application <br />for this permit, fixetl the amount of bond and directed that <br />this permit be issued upon the filing with the division of <br />bond in the amount so fixed in form and substance approved <br />by the division, and such bona has been so furnished. <br />II[. Un _SP~tamhP.r 13____+ 1982_, the division made the fol- <br />lowing findings: <br />a) The permit application is accurate and contains <br />all information required under U.R.S. 1973, 34-33-101 £S <br />Aga. and regulations promulgated thereunder and that all <br />the requirements of article 33 of title 34, C.R.S. 1973 <br />("such article") for the issue of a permit have been complied <br />with; <br />b) The applicant has demonstrated that reclamation <br />as required by such article can be accomplished under the <br />reclamation plan contained in the permit application; <br />C) The assessment of the probable cumulative impact <br />of all anticipated mining in the area on the hydrologic bal- <br />ance specified in section 34-33-110(2) (1) has been made by <br />the division and the proposed operation thereof has been <br />designed to prevent material damage to hydrologic balance <br />outside the permit area; <br />d) Granting the permit will not Conflict with any <br />designation decision issued pursuant to section SZ2 of the <br />federal "iurface Mining Control and Reclamaticn Act of 1977", <br />a; amended, (P.L. 95-87). nor is the area proposed to oe <br />mineC within an area under study for unsuitability designa- <br />tion in an administrative proceeding commenced pursuant to <br />section 34-33-126 or section 522 of said P.L. 95-87. <br />e) (I) Unless the prcposed operation was an cper- <br />ation which produced coal in commercial quantities in the <br />