My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42783
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42783
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:36 PM
Creation date
11/23/2007 11:58:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994117
IBM Index Class Name
General Documents
Doc Date
11/20/1995
Doc Name
MEMO-STATUS OF CORRECTIVE ACTIONS
From
DMG
To
FILE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DIVISION OF MINERALS AND GEOLOGY <br />Depadmenl of Natural Recourses <br />1313 Sherman SI„ Room 215 <br />Denver, Colorado 80203 <br />Phone. 0031 db6-3567 <br />FAX: 1301) 832-4106 <br /> <br />G~rn^r~ OF COLORADO <br />III IIIIIIIIIIIIIIII <br />999 <br />Ray Romer <br />Governor <br />MEMO TO FILE lames 5 Lachhead <br />Executive Director <br />Michael B. Long <br />DATE: 11/20/95 SPECIALIST: Allen Sorenson Division DireUOr <br />OPERATOR: Colina Oro Molino, Inc. FILE NO: M-94-117 <br />RE: Statue of Corrective Actions <br />TYPE OF INTERACTION: MEETING, PHONE, OTHER: Voice Mail Message <br />PERSON(S) CONTACTED AND AFFILIATION: Ric Fanvo, Dufford and Brown, <br />Attorney for COM, Inc., 861-8013 <br />SUMMARY AND RESOLUTION OF INTERACTION: <br />1. Mr. Fanyo stated that essentially all of the corrective actions were completed <br />with the exception of the removal of tailing from the Hazel-A adit. <br />2. COM, Inc. is preparing a plan for submittal to the Division describing the <br />procedures to be followed in the tailing removal project. Tentative starting date <br />for the tailing removal ie 11/27/95, with a goal to complete the project by the <br />12/1/95 deadline established by the Division. <br />3. Extrusion welding by the liner contractor (In-Line Plastics) was completed on <br />11/16/95. <br />4. The game fence around the tailing pond was replaced over the weekend (11/18 & <br />11/19/95). The fence poets were set in concrete. <br />5. Current permit number was painted onto the entrance sign. <br />6. The berm below the ore yard was rebuilt. . <br />7. Upland diversion ditch berm was extended and compacted, area above tailing pond <br />that was disturbed by ditch work was seeded. <br />8. Hazel-A portal closure was stabilized with concrete. <br />9. Hazel-A coffer-dam was raised such that crest height ie clearly above float switch <br />triggering elevation. <br />30. All scrap and trash removed from the site including the old fuel tank. <br />11. Hay bale hoe been keyed into outlet of the sediment pond located below and between <br />the mill and the tailing pond. <br />C: \HP51\GOLDHILL.MEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.