My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42523
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42523
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:17 PM
Creation date
11/23/2007 11:50:37 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
General Documents
Doc Date
3/12/1987
Doc Name
1987 ALFALFA MANAGEMENT AND CONTROL PLAN
From
PEABODY COAL CO
To
MLRD
Permit Index Doc Type
VEGETATION
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PQ_y <br />PE480DY COAL COMPANY <br />Western Divlalon <br />March 7, 1987 <br />Mr. Steve Renner <br />Hydrologist <br />Mined Land Reclamation Division <br />423 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br />~'~ <br />III IIIIIIIIIIIIIIII <br />1300 South Vale <br />Flagataff, Arizona 86001 <br />(fi02) 774-5253 <br />~Fr ~~~~® <br />P11AR 121987 <br />lvSIN~D LAND <br />~ECLArpA'fION DIVISION <br />RE: Seneca II Mine Alfalfa Management and Control Plan <br />Dear Steve: <br />During the Seneca II Mine permit renewal process, an issue <br />was raised by the Division concerning the heavy <br />composition of alfalfa in areas of the reclamation. As <br />stated on page 34 of the permit renewal Findings Document <br />(December 31, 1986), Peabody was to have submitted an <br />alfalfa management and control plan to the Division by <br />February 1, 1987. <br />At this time, the basis for the management and control <br />plan has been formulated and the primary methods and <br />procedures for implementation have been outlined. In <br />order for the plan to be feasible for implementation and <br />provide effective results, a nwnber of details and <br />variables must be addressed. These include specific <br />herbicide application methodologies for the treatment <br />areas and grazing and land management issues including <br />selection of a private livestock operator to graze overall <br />areas to be treated. Peabody's Environmental, Land and <br />Operations Departments, along with Seneca II Mine <br />personnel, are coordinating efforts at this time to <br />finalize the details of the management and control plan. <br />to be implemented beginning later this spring. <br />Based cn the above discussion and the desire to formulate <br />a realistic and effective management and control plan, <br />Peabody hereby requests a submittal date of April 15, 1987 <br />for the alfalfa management and control plan. The plan <br />submitted at that time will be concise and will contain <br />the specific short and long term management and controls <br />
The URL can be used to link to this page
Your browser does not support the video tag.