My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL42507
DRMS
>
Back File Migration
>
General Documents
>
GENERAL42507
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:11:15 PM
Creation date
11/23/2007 11:49:49 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
5/7/1982
Doc Name
VARIATIONS FROM POND DESIGNS
From
GREAT DIVIDE ENGINEERING & SURVEYING
To
GEC MINERALS INC
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIII III <br />GREAT DIVIDt tN~~NEERING - <br />AND SURVEYING ' ~° ~~3f~ ~~~~~ <br />530tP~4 ,.. ,•~~~5 t~W~ ~~ <br />P. 0. Box 605 404 N. 19th Street~SQ~ 1 ~1 J` V , <br />Phone 303 275-8881 (• .,~~.`~;~ <br />Canon City, Colorado 81212 2Q~'~ 1' <br /> 3 <br />GEC l97NERALS, INC ~i e, '`~ "~ <br />BOX 225 ~i "`'" <br />FLOREIJCE, CO April 12, 1982 <br />RE: Variations fro m pond desigas <br />The following list represents the variations found between <br />design and existing conditions while designing the sedimentation <br />ponds requested by your office. These variations are for the <br />sedimentation ponds A,B,C',D,Temp. . <br />1J Pond A- The design shows the emergency spillway to be 21' <br />wide with a water depth of 1=;'. Tlie existing spillway at <br />only 5' wide, needs to be widened, with rip-rap, to the <br />above width. Additionally, the emergency spillway needs <br />to be lowered 0. 7' while the dam crest must be raised 2'. <br />2J Pond C- Pond C design drawing shows a 45' dam width on top <br />for the proposed roadway- The existing dam needs to be <br />widened approximately 23' to the north, with rip-rap as <br />detailed in design drawing and extension of the primary <br />spillway outlet pipe. <br />3) Pond D- Primary spillway outlet shows a 12" Ch1P. An 8" <br />.Ch1P is eristiny, which needs to be replaced. The bottom <br />of the dam is shown as much higher than existing, and reeds <br />to he raised. <br />4) Pond Temp- The existing elevation of the primary spillway is <br />just slightly lower than the emergency spillway, as shown <br />on the drawing. Tlie existing primary outlet should be <br />lowered one foot, The emergency spillway was redesigned <br />for a water depth of 3/4 foot and existing spillway width. <br />truly yours, <br />
The URL can be used to link to this page
Your browser does not support the video tag.