Laserfiche WebLink
~~ iiiiiiiiiiuiiiiii, <br />u~y~~•I)~~., <br />MAY 2 p 1996 <br />Seneca ll 1996 Rill and Gully Survey~~10"~''"""c'`"s~'UCCwyy <br />Area Number Description of action required Date to finish <br />Rock dams cast of EI & FI intersection <br />need rebuilt and revcgctated. (Wadgc impondment <br />drainage) 10-31-96 <br />2 Main W.C. reclamation drainage channel <br />(from pond 31 to pond 26) needs more riprap, <br />rc-graded and shaped. 10-31-96 <br />3 Stockpond #4, below solid waste arcs, <br />needs finished, riprappcd and revcgctated. 10-31-96 <br />4 Several stockponds (I, 2, 15, 7) need <br />cleaned out and reshaped. 10-31-96 <br />5 Newly reclaimed auger area "E" drainage <br />channel needs constructed. stockponds 17 and <br />20 built and lateral drainage from the south <br />nccds constructed. 10-31-96 <br />6 Drainage channel upstream and north of Pond 004 <br />nccds constructed, ponds 13 and 12 built and <br />revcgctated. 10-31-96 <br />7 Drainage channel from Diversion # I nccds graded <br />riprappcd and stabilized. (Along stockpile LL) 10-31-96 <br />