Laserfiche WebLink
e <br />,: <br />~VF~CO~O ., <br />~ ~-~ • <br />~( 9 <br />n '., <br />~el -~~. ~ \Gy <br />x f ~ r/ <br />RiU ia,tl D Lamm <br />Gnve~~or <br />• • <br />DEPARTA4ENTOFNATURALREoOURCES <br />D r.lc ~~n• Pisi ,~ E.?tab•e nn~~ei r~ <br />MINED LAND RECLAMATION DIVISION <br />DAVID C. SHELTON Director <br />March 2, 1982 <br />Ms. Paige B. Seville <br />Senior Coordinator - <br />Permits 6 Compliance <br />ARCO Coal Company <br />Box 5300 DLT 1117 <br />Denver, Colorado 80217 <br />Dear Ms. Be vill e: <br />iii~iiiii~ii~~ii~ii <br />The Division has received your responses to the following stipulations attached <br />to permit No. C-007-80 for the Mt. Gunnison No. Z Mine: <br />November 18, 1981-Response to stipulations #37,9&10(#20,38639 in the MLRD Findings <br />Document) <br />December 15, 1981-Response to stipulation #34(#7 in the MLRD Findings Document) <br />January 29, 1982-Response to stipulations #31(895 ) <br />February 3, 1982-Revised response to stipulation #93(#10 in the MLRD Findings <br />Document) <br />February 5, 1982-Response to stipulation #35(#8 in the MLRD Findings Document) <br />February 8, 1982-Response to stipulation #17(#16 ) <br />February 10,1982- #18(#30 ) <br />February 18,1982- #33(#5 ) <br />February 19,1982- #38(#31 ) <br />February 19,1982- #2 (#2 i <br />The responses to stipulations 37,9,10,34,35,17,15,33 & 38 are currently under. <br />review by the Division technical staff. Their review comments should be completed <br />in the near future and will be forwarded to you as soon as possible. <br />The responses to stipulations 93,18, and 2 as listed in the Mt. Gunnison No. 1 <br />Mine permit document (or cross-reference list) have been reviewed by the Division <br />and the responses are sufficient to satisfy the requirements of these three <br />stipulations. Stipulation ,`'o. 93 concerns the submittal of a report entitled <br />"Frotec tion of the Pfi nnesota Creek tJa ter Supply" as an exhibit within the permit <br />application; stipulation No. 18 concerns the submittal of appropriate technical <br />references/sources justifying the proposed shrub density standard, and stipulation <br />No. 2 concerns the submittal of a sediment control plan for the loadout facility. <br />The response to stipulation No. 31 which requires that ARCO include within the <br />permit application all ARCO responses contained in the two volumes titled <br />"Responses to State MLR Comments" and "Completeness Review Responses" has been <br />reviewed by the Division, and the response is sufficient to satisfy the require- <br />ments of the stipulation, with one exception. It appears that the discussion <br />423 Centennial Building. 1313 Sherman Slreet Denver, Colorado 80203 Tel. (3031 866-3567 <br />