My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38604
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38604
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:18 PM
Creation date
11/23/2007 9:45:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981029
IBM Index Class Name
General Documents
Doc Date
3/27/1986
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III IIIIIIIIIIIIIIII <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department o(Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, CO 80203 <br />Phone: (303) 866.3567 <br />fAX: (3031 832-8106 <br />March 27, 1986 <br />Mr. Bryan Archer <br />Sun Coal Company <br />5440 Ward Rd, Suite 110 <br />Arvada, CO 80002 <br />Re: Mid-Term Review of Meadows No. 1 Mine, Permit No. C-81-029 <br />Dear Mr. Archer: <br />OF'~O(O <br />~ :R~ <br />• rB 16 <br />Roy Romer <br />Governor <br />Michael B. Long <br />Division Director <br />Enclosed is the Division's mid-term review for the Meadows Mine, Permit No. <br />C-81-029. The review was performed in fulfillment of Rules 2.08.3, 2.06.2(9), <br />2.06.3(4), 2.06.5(3), Z.06.7(5), and 3.02.2(4). <br />The mid-term review primarily consisted of reviewing the permit application, <br />stipulation responses, revisions and any supplemental information, as well as <br />information.from field inspections and past inspection reports. The main <br />purpose of the review was to identify any areas of the permit application that <br />will need to be revised or modified to ensure compliance and ~'eflect the <br />current status of the mine. <br />The enclosed document contains our mid-term review, timetables for submitting <br />responses, a summary of the status of stipulations, and the results 'of our <br />performance bond review. The only revisions found to be needed involved the <br />Sediment Disposal Plan. <br />Several other areas of the permit application require clarification or <br />up-dating, but may not require revisions to the permit. These items are <br />discussed in Section III of the revie~,a. Most of these items pose no immediate <br />environmental concerns, but may be needed to clarify the mine plan, or to <br />provide additional information. <br />The Division requests that Sun Coal Company submit appropriate responses to <br />our concerns by May 31, 1986. The responses should be submitted in a package <br />using a format that allows easy insertion of the responses directly into the <br />original permit application. Due to the fact that the permit application does <br />not have page numbers, it may be necessary to resubmit three new copies of the <br />application narrative. <br />
The URL can be used to link to this page
Your browser does not support the video tag.