My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL37074
DRMS
>
Back File Migration
>
General Documents
>
GENERAL37074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:57:21 PM
Creation date
11/23/2007 8:58:21 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994093
IBM Index Class Name
General Documents
Doc Date
10/24/2003
Doc Name
Approval of Plans and Specifications for Construction
From
SEO
To
Applegate Group Inc.
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER ~ oe•co~o <br /> <br />Division of Water Resources <br />Departmen( of Naturtl Resources <br />~ ~ <br /> <br />~° <br />.~~ <br />'1373 Sherman Street, Room 818 <br />+ o ~. <br />~ <br />'t <br />Denver, Colorado 80203 ~ a raj6 r <br />Phone (303) 866.3581 <br />fAX (3031 866-.3589 <br />Bill Owens <br />vnvwwa[ecsta[e.co.us Governor <br /> Greg E. Wakher <br /> ~CtObeI 24, 2003 ~ executive Director <br /> <br />Mr. Mike Applegate, P.~ <br />Gx,it,efZA-L C~c9 P.22S(~o-~31~~~-` Hal D. Simpson, P.E. <br />State Engineer <br />Applegate Group, Inc. <br />'s ~_ ~ ~ pnf 3 ~~ <br />~~~ <br />1499 West 120 <br />Avenue, Suite 200 ~,\ 1 n n • _. <br />Denver, CO 80234 ~ <br />l\ !L <br />•t~N <br />`' <br />" <br /> ~ ~ <br />~ <br />~ <br />~~ 3 <br /> <br />When replying, please refer to: X61 <br /> TIGERS DAM <br />Construction File Number: C-1818 y~,,,l <br />C~ . I°e ~ ~ 2 Z <br /> Water Division 1, Water District 2 4¢_orl3 ~ ~`i °~'`° `° <br />SUBJECT: Approval of Plans and Specifications for Construction '-~ <br />Deaz Mr. Applegate: <br /> O <br />Thank you for submitting, for the review and approval of the State Engineer, the plans and <br />specifications for the construction of the new Tigers Dam and associated appurtenant structures in Adams <br />County. The review of the design and construction documents was performed as an independent third party <br />review. The documents were reviewed by ECI on behalf of our office. They have completed their review of <br />the design and construction documents and have found them to be acceptable for construction. Mr. Rodney <br />Eisenbraun of ECI by letter dated July 2, 2003 has recommended the documents be approved for the <br />construction of this proposed dam. His recommendation is contained in the Final Report for the Third Party <br />Review of Tigers Reservoir. Their report is dated Mazch 13, 2003. <br />Although Mr. Eisenbraun recommended approval, this office also required additional changes to the <br />documents. These changes consisted mainly of changes to the specifications for the dam embanlnnent <br />materials, the details of the tie-in between the existing slurry wall and the new dam embankment, and the <br />construction of the spillway. These changes have been incorporated into the documents. We aze transmitting <br />two copies of the construction specifications, and under a sepazate cover, one mylar cover sheet and one set of <br />the construction drawings with approval signatures for the construction of this proposed project. Our <br />acceptance and approval of these documents aze mainly based on Mr. Eisenbraun's recommendation and aze <br />effective as of the date of this letter and contingent on the following items: <br />The spillway should be provided with a concrete crest control structure. As a minimum, the control <br />structure should be constructed as a cutoff wall with a minimum depth of five feet and width of one <br />foot. The top of the wall should be placed such that it is at the minimum elevation of the spillway of <br />5,069 feet and is higher than the riprap and soil placed upstream and downstream of the wall. The <br />design and construction documents for the spillway should be submitted to this office for our review <br />and approaa}-priorta the'sfmtof cousttvctiosofthisproject: . <br />The contractor should develop a written plan of how the dam embankment materials aze to be placed <br />and compacted over the .top of the slurry wall. A test section should also be constructed to <br />
The URL can be used to link to this page
Your browser does not support the video tag.