Laserfiche WebLink
Mountain Coal Company <br />West Elk Mine <br />Post Olfice Box 591 <br />Somerset, Colorado 81434 <br />Telephone 303 9.'35015 <br />Fax 303 9235595 <br />October 31, 1994 <br />Mr. & Mrs. Larry Mautz <br />1938 Highway 133 <br />Paonia. CO 81428 <br />Re: Subsidence Survey <br />Dear Mr. and Mrs. Mautz: <br />' III IIII VIII IIII III <br />999 <br />Please sign here as confirmation that <br />you have received this letter. <br />Da t <br />To verify our arrangements, Mountain Coal Company (MCC) is planning to conduct a survey of <br />your new cabin and the surrounding area on November 3rd. In the case of bad weather, <br />November 4th may be the option (and we would notify you of such). This survey should only <br />require a few hours that day -mostly outside the building. We will also survey the location of the <br />cracks that were recently filled in the road. <br />I appreciate that you called us about those cracks. The professional Geologists and Engineers <br />investigating subsidence for MCC took some time to take a look at them when they were <br />conducting their field study the week before last and will include them in the findings of their <br />study. (Pardon that it wasn't clearly communicated that they might be on your property on <br />Friday, as well as Thursday that week.) Should you notice other cracking or other unusual <br />changes, please contact me so that this information can also be investigated and necessary <br />maintenance completed. <br />Also, for clarification, MCC has not given nor will not give anyone permission to hunt or camp on <br />your property nor MCC property. You are authorized by the June 1993, agreement with MCC, <br />to access and limit trespass on MCC's property in Section 18, except to MCC, its assigns, agents <br />and lessees, as is also specified in the agreement. <br />As you are aware, the construction of the fan facilities continues at the fan bench site, and will be <br />the primary activity in this azea for the next few months. During short periods of time (one to two <br />hours), the road may be blocked as equipment for the construction project is being hauled in or <br />out. We will try to contact you then to coordinate your and our traffic on the Lone Pine road. <br />Please feel free to call me at 929-2256 or Phil Schmidt should you have questions. <br />Sincerely, <br />~~ //~/~ <br />Kathleen G. Welt, <br />Environmental Supervisor <br />t~W,1 <br /> <br />