Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATE OF COLOT~DO <br />Roy Romer, Govei <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, D~r~ctor <br />DATE: December 19, 1988 <br />T0: Susan Mowry <br />FROM: Carl Mount~~(/~ <br />P.E: Bond Inspection Strategy for Peabody Loal Company's <br />Seneca II Surface Mine, Permit C-80-005 <br />Inspection to determine bond adequacy at the Seneca II Mine will consist of <br />the following: <br />1. A field map similar to the Nucla Mine Exhibit(F 4 - Reclamation <br />Reoulation's Delineation Pfap (as modified) will be prepared in <br />cooperation with Peabody representatives (preferably <br />Mr. James Lunan). <br />2. Compliance with the mine plan will be field verified especially in <br />the Wolf Greek, Wadge and Scraper Pit areas. Auger area E will <br />also be of concern but the amount of attention focused on thi; area <br />will be Determined by the outcome of the upcoming TR which will <br />request a variance from concurrent reclamation to place an adi? for <br />future underground mining tnere. <br />... 7oosoil stockpiles and haul distances will be mezsured in the field <br />and with the aid of aerial photographs. <br />S. Topsoil thickness on newly reclaimed areas will be mezsured. <br />5. Vegetation W111 be me2S^red on Some rectal med arEaS iS needed. <br />2077=/scg <br /> <br />2i5 Centennial nuilomy, 13.3 She mac Snee; Denver, Colorado 80203-2273 ie1.;303) 855-955; <br />