Laserfiche WebLink
III IIIIIIIIIIIII III <br /> 999 <br /> 131 NORTH 351h AVE. <br /> POST OFFICE BOX 820 <br /> BEST-WAY PAVING CO. TELEPHONE 353.1654 <br /> W <br /> GREELEY, COLORADO <br /> CARL V. HILL, GEN. MGR. ZIP CODE 80631 <br /> New Moi!ing Address: <br /> BEST-WAY PAVING COMPANY <br /> June 23, 1982 P. O. Brx = 89 <br /> Gree-e% sado 80633 <br /> C NE <br /> Mr. David C. Shelton JUP! 2 8 1982 <br /> Mined Land Reclamation <br /> 423 Centennial Building <br /> 1313 Sherman Street MINED LAND RECLAMATION <br /> Denver, CO 80203 Colo. Dept. of Natural Resources <br /> Dear Mr. Shelton: <br /> Enclosed please find the Best-Way Paving Co. _reclamation plan. Best-Way is <br /> also requesting a minor change in the reclamation plan previously approved <br /> by the commission. <br /> When the plan was initially submitted, it was anticipated that D-watering <br /> could be pumped directly into the irrigation canal paralleling the north line <br /> of the property. This could not be accomplished as the ditch company could <br /> not take any additional water. When mining of phase one began it became <br /> obvious that any D-watering would have to be pumped to the northeast corner <br /> of the property where the water would be pumped into the city storm sewer and <br /> carried to the Poudre river. Phase one has been mined to just above the water <br /> table. Due to the expense of piping and pumping the water from phase one, <br /> then cutting it off to D-water phase two and again progressively expanding the <br /> pumping system as other phases are devleoped, it does not appear practical. <br /> We would request that we be allowed to complete excavation of phase one follow- <br /> ing phase fourteen as this is a much more practical sequence and should not <br /> make any appreciable difference in reclamation of the property. <br /> Thank you for your cooperation. <br /> Very truly yours, <br /> Thomas A. Connell <br /> Vice-President, General Counsel <br /> TAC/cnd <br /> Enclosure <br />