Laserfiche WebLink
Doc Date:12/1112001 -~ <br />iiiiiiiiiiiiiiiiiii <br />sss <br />1 - STATE OF COLC <br /> <br />• <br />Roy Romer. Governor <br />DEPARTMENT OF NATURAL RESOURCES <br />MINED LAND RECLAMATION DIVISION <br />FRED R. BANTA, Dlr~ttor <br />July 26, 1989 <br />Mr. Dave Maxwell <br />Office of Surface Mining Reclamation and Enforcement <br />western Technical Office <br />1020 15tH Street <br />Denver, Colorado 80202 <br />RE: Mt. Gunnison No. I Mtne, TR 55, File C-80-007 <br />Dear Mr. Maxwell: <br />Following is a summary of the 8-seam revision and other pertinent information <br />as you requested. The Mt. Gunnison Mine began producing coal in 1982 from the <br />F-seam. Full production using a continuous miner Has averaged approximately <br />500,000 tons per year from undermining approximately 900 acres of the 4276 <br />acre permit area. The permit area generally lies south of Highway 133 and <br />north of the Minnesota Creek drainage divide. <br />B-seam Mtne Plan <br />In April, 1989, the applicant applied to the Division and received approval to <br />oegtn mining in the 8-seam. Approval of the revision was granted July 12, <br />1989. Access to the B-seam will oe accomplished through the construction of <br />two north-south ramps, and a ventilation shaft in the SW 114 of Section 21, <br />T13S, R90W from the F-seam to the 8-seam, 390' below. Initially, room ana <br />pillar mining will oe performed with a continuous miner. This work will De <br />done in a manner to develop panels for later removal using longwall methods, <br />and to produce as much as 1.4 million tons Der year. This revision aoes not <br />entail any aaaitional surface disturoance since ali access and ventilation <br />facilities will De contained within the F-seam workings. The permit area has <br />been increased, However, by 35.5 acres to accommoaate the B-seam mine main <br />access entries. <br />Long-range plans propose mining of the intervening E-seam south of the ramps, <br />following extraction of the B-seam. The E-seam lies 180-200 feet below the <br />F-seam and 200 feet above the B-seam. The 1989 mine plan permitting action <br />covered the B-seam exclusively. <br />Once the access ramps and ventilation shaft has been completed the B-seam main <br />will oe driven to the west. Bleeder entries will be driven to the north ana <br />then west to define the mining blocK ana 8 panels. These panels would then be <br />extracted oy a retreating longwall. This olock is anticipated to oe mined out <br />. oy 19 y9. See Exnioit 3.4.A.1. <br />215 Centennial Building, 1313 Sherman Strset Denver, Colorado 80203-2273 Ts1.13031 8663567 <br />