My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL33274
DRMS
>
Back File Migration
>
General Documents
>
GENERAL33274
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:20 PM
Creation date
11/23/2007 7:35:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981025
IBM Index Class Name
General Documents
Doc Date
3/7/1983
Doc Name
SNOWMASS COAL OBJECTIVES FOR MARCH
From
MLRD
To
NORTH THOMPSON CREEK FILE ED BISCHOFF
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DEPARTMEN• FNATURALRESOURCES <br />D Monte Pascoe. Eeccubvc Oucaor <br />MINED LAND RECLAMATION DIVISION <br />DAVID O. SHELTON Director <br />PocharO O. Lamm <br />Governor <br />DATE: riarcll 7, 1983 <br />TD: North Thompson Creek File/Ed Bischoff <br />FROM: Bob Liddle,~ <br />RE: Snowmass Coal Ubjectives for March <br />As a result of our February 23, 1983 meeting with Snowmass the following <br />objectives were agreed upon. <br />Snowmass would respond to many of our hydrology stipulations with <br />the goal of eliminatiny as malty stipulations as possible. The <br />Division agreed to review these responses as they come in. <br />2. Jim Pendleton was to review the UUE subsidence monitoring data and <br />try to eliminate this stipulation. <br />3. The Division was to take a written stance on the question of the <br />amount (if any) of mine inflows were tributary to the Thompson <br />Creek. This stance was to be forwarded to the SEU to assist them <br />in their detennination of what augmentation will be needed by <br />Snowmass. <br />4. The Division will meet with the SEO sometime middle March to agree <br />on a course of action. ND date has been set but this should take <br />place prior to the Snowmass meeting. <br />5. MLRD and SEO will meet with Snowmass on t4arc11 23 at 1:00 to discuss <br />water rights and final findings document wording. <br />6. USM will be sent our proposed draft on P1arch 25, 1983 for their <br />comments. <br />7. Uur goal is to incorporate OSM comments and publish our decision <br />April 1, 1983. <br />/ep <br />Uoc. No. 1310 <br />423 Centennial Building, 1313 Sherman Street Denver, Colorado 80203 Tel. (303) 866-3567 <br />
The URL can be used to link to this page
Your browser does not support the video tag.