My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32635
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32635
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:55:04 PM
Creation date
11/23/2007 7:22:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
General Documents
Doc Date
4/27/1992
Doc Name
STIPULATION 18 Letter
From
PEABODY COAL CO
To
MLRD
Permit Index Doc Type
Stipulation
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pQ-4 <br />PEABODY COAL COMPANY <br />Wssfsrn Dlvblon <br />April 24, 1992 <br />Ms. Susan Morrison <br />Mined Land Reclamation Division <br />1313 Sherman Street <br />Room 215 <br />Denver, Colorado 80203 <br />RE: Seneca iI-W Mine Permit C-82-057 <br />Stipulation 18 <br />Dear Ms. Morrison: <br />III IIIIIIIIIIIII III <br />999 <br />1300 South Vale <br />Flagstaff, Arizona 86001 <br />(602) 77<~6253 <br />~~~~~~~~ <br />iPR 2 7199; <br />Re~~;y~~ed hand <br />'f~nn rl:..•.: <br />The following information is submitted to satisfy <br />Stipulation 18, Permit C-82-057, Seneca II-W Mine <br />which stated, "Prior to initiation of construction <br />of Haul Road G, the permittee will submit the land <br />owner request for haul road retention as required <br />by Rule 4.03.1(i)(f)(ii), or will otherwise modify <br />the reclamation plan to comply with Rule <br />4.03.1(i)(f)." <br />Peabody Coal Company and Elizabeth Tieken are the <br />surface owners for the right-of-way land for Haul <br />Road G (see Permit Exhibit 3-1). Peabody's request <br />to retain Haul Road G as a permanent structure is <br />presented in numerous sections of the approved PAP <br />(see Tabs 13, 19, 21, 22, and 25). Elizabeth <br />Tieken's request to retain Haul Road G as a <br />permanent structure is presented in the enclosed <br />easement dated August 9, 1990 by and between <br />Elizabeth Tieken and Peabody Coal Company. <br />Please contact me if you have any questions <br />concerning the enclosed information. <br />Sincerely, <br />~Q„~ ~, <br />Gary W. Wendt <br />Supervisor, Permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.