My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL32427
DRMS
>
Back File Migration
>
General Documents
>
GENERAL32427
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:59 PM
Creation date
11/23/2007 7:18:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
General Documents
Doc Date
10/9/1984
Doc Name
STIPULATION 1 RESPONSE FN C-034-81
To
MLR
Permit Index Doc Type
STIPULATIONS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
•; . <br />~\ <br />~... - . _l <br />..x.. <br />r~ <br />_~, ~~~ <br />~, <br /> <br /> <br /> <br />October 9, 1984 <br />Mr. Dan Mathews <br />Reclamation Specialist <br />Colorado Mined Land Reclamation <br />1313 Sherman Street, Room 423 <br />Denver, CO. 80203-2273 <br />RF: Stipulation ;Y1 Response, <br />File ~tC-034-81 <br />Dear Dan: <br />Firs! and Columbia <br />P. O. F''cx 22G <br />Delta, Gnio. 81416 <br />Office: (3 J') 874-7561 <br />Mine: (303) 85G-6402 <br />The following information on Stipulation i;l is being submitted in <br />response to your letter of September 12, 1984: <br />The 2~i-hour underground mine water storage was based upon <br />previously accepted calculations (page 99 of the Permit) <br />and upon the fact that the pumping can be manually controlled <br />and, therefore, can be stopped if a conflict in water storage <br />looks imminent. If discharge approaches the 26.1 9pm esti- <br />mated, the pu;nps will likely be set up on a float switch to <br />discharge at least daily. <br />Mine water is primarily settled u:derground in a series of <br />sumps which would have an average retention time of two days <br />if we were to reach the 26.1 gpm discharge projected. The <br />highest'total suspended solids' measured in the last three <br />years leas been 52 mg/1, trhich equates to 0.0022 acre-feet/ <br />year of sediment, if 100 settling occurred. The problem <br />with suspended solids occurred tvllen the mine water did not <br />go through any sump, but went directly outside. <br />A quarterly survey of th <br />of a calculation fro;n tl <br />to the sediment level at <br />sedim=nt deptfr .:ear the <br />of this calcu' .ton will <br />pond inspection. <br />e sedi;nent in tfre pond will consist <br />e measurement of the sediment deposited <br />the intake end of the pond and the <br />discharge end of the pone. The result <br />be a part of the quarrterly sediment <br />Attached is a certified drawing of a cross-section through <br />the existing sediment pond dam. The pond was designed <br />~II ~I~~II~II~~~~~I• <br />sss <br />-continued- <br />
The URL can be used to link to this page
Your browser does not support the video tag.