Laserfiche WebLink
~Y ' <br />REPLY TO <br />ATfENTON OF <br /> <br />DEPARTMENT OFTHE ARMY / / M ~~I ~~ <br />U.S. ARMY ENGINEER DISTRICT, SACRAMENTO ,~ <br />/ 1/ r I l <br />CORPS OF ENGINEERS <br />1325 J STREET o~ <br />~~~ ~~~ ///~~~ ~/1 <br />ry .I'~ L <br /> <br />SACRAMENTO, CALIFORNIA 95814.2922 1~ <br />I ' ~ b "~ <br />November 28, 2003 <br />Regulatory Branch (199475346, 199475348, 199475349) <br />R~C:~Ii/~[~ <br />DEC 1 1 2003 '~ <br />Mr. David Dillon <br />Sandco, Inc. (/ <br />Post Office Box 4440 <br />Durango, Colorado _ 81302 <br />Dear Mr. Dillon: <br /> <br />9i~lsion of Min^rals and Gzolr^~ <br />This letter is in response to your request for cone-year extension of your permits for <br />gravel mining activities within the Animas River. According to our July 14, 2003, letter <br />(enclosed), you must demonstrate that your operations are in compliance with the permit <br />conditions in order to receive an extension for your activity. <br />According to your September 19, 2003, letter prepared by Mr. Frank Anesi, your <br />October 21, 2003 letter, and a meeting between Mr. Frank Anesi, Mr. Lee Queen, and Ms. <br />Kara Hellige on October 10, 2003, this office has determined that your operations are not <br />completely in compliance with the conditions of your permits. However, this office has <br />decided to extend the construction period under Condition No. 1 of Department of the Army <br />Permits No. 19947534, 199475348, and 199475349 to November 30, 2004, provided that <br />you abide by the Following Special Conditions: <br />1) To prevent the relocation and/or reconfiguration of the stream channel, which <br />can cause an increase in water temperature and channel degradation, you shall limit all <br />excavation to one foot above the current thalweg elevation. You shall not excavate below the <br />1996 ]ow-flow river channel, under any circumstance. <br />2) In order to preserve the important ecological functions of the riparian ecosystem, <br />you shall provide a 25-foot buffer between your activity and any adjacent vegetated riparian <br />cotnmunities. <br />3) To aid in problems of potential channel instabilities, you shall provide a 3:1 or <br />less slope between your mining activity and the 25-foot buffer area. <br />4) You shall submit plans for your proposed mining activity to the Durango <br />Regulatory Office. You shall provide across-sectional view that contains the 1996 low-flow <br />elevations, the pre-mining survey elevations, the proposed mining elevations, and the current <br />