My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL31754
DRMS
>
Back File Migration
>
General Documents
>
GENERAL31754
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:54:42 PM
Creation date
11/23/2007 7:04:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
6/6/1994
Doc Name
JUNE 2 1994 ON SITE MEETING WITH THE COAL PROGRAM ENERGY FUELS BILL COLGATE AND PRESTON MEESE
From
DMG
To
GEC EAST PIT RECLAMATION PROJECT FILE
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~. <br />• iiiiiiiiiiiuiiiiii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Na wral Resources <br />1313 Sherman 51 . Room 215 <br />Denver, Colorado 80203 <br />Phone: (3031 866-3567 <br />FAX: (303/832-8106 <br />~~~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />June 6, 1994 <br /> Ruy Rn mer <br /> Guerrnor <br />To: GEC East Pit Reclamation Project File Kens.,ia~a, <br />From: Jim McArdle E.ernhveohe<~r,r <br />Subject: June 2, 1994 on site meeting with the Coal Prognaur~s.ln~s <br />Energy F uels, Bill Colgate and Preston Meese. oiw stun orteOnr <br />On June 2, 1994, I arrived at Hardy's in Florence at 6:50AM and <br />reviewed the project documents in preparation to today's meeting. <br />At B:OOAM, I provided Dave Berry and Shawn Smith with an update on <br />the status of the GEC Reclamation Project. The three of us arrived <br />at the Energy Fuels office at approximately 8:30AM and contacted <br />Randy, AL and Clint. The following additional people met us on <br />Chen's Hill and the West Slope; Larry Routten, Erica Crosby, Harry <br />Ranney, Bill Colgate (temporary project manager), Preston Meese <br />(Contractor). The following are the results of this meeting: <br />A. Consider reducing gravel from the V ditch located on the uphill <br />side of the access road below Chen's Hill and place excess gravel <br />on the road. <br />B. Dip the road toward the V ditch approximately 2 percent. <br />C. The Coal Program would review the ditch sizing and reduce the <br />ditch width and depth where possible. <br />D. The Energy Fuels representatives indicated that the road was in <br />the permit but the ditch was outside of the permit. The coal <br />program indicated that they would check on the permit status of the <br />ditch and road. <br />E. Energy Fuels representatives requested that a 2 foot berm be <br />established on the south side of the fuel loadout area. <br />F. Energy Fuels representatives expressed concern regarding <br />potential erosion from the recontoured reclaimed slopes above <br />Magpie Creek east of the west pit, and about crossing the Magpie <br />Diversion to access the west pit area. It was jointly decided that <br />a combination ditch\access road would be installed from the fuel <br />loadout to the west pit sed pond area. The Coal Program also <br />requested that this access be wide enough to allow Phil Kessler <br />access with his trucks. Subsequent discussion with Erica on June <br />6, 1994 set the road width at 10 feet. Approximately 1/2 of the <br />drainage would flow to magpie creek across the access road and <br />
The URL can be used to link to this page
Your browser does not support the video tag.