Laserfiche WebLink
NOLNAM INC <br />Portland Plant <br />3500 Highway 120 <br />P.O. Boz 349 <br />Florence. Coloratlo 81226 <br />719-784-6325 <br />Faz 719-794-3a70 <br />HOLNAM <br />III IIIIIIIIIIIII III <br />999 <br />August 14, 1997 <br />Mr. Larry Oeliler, Reclamation Specialist <br />Colorado Deparuuent of Minerals & Geology <br />Centennial Building <br />1313 Sherman Stree[, Room 213 <br />Denver, CO 80203 <br />Re: MLRB Mining Permit No. M-77-3~id <br />Due to production requirements we find it necessary to move the nilning operation to Cut No. 12 as <br />shown on Holnalu Inc. Map pcc1387e .Preliminary road building should start within the nevi week to <br />10 days., wiW major excavation of the Cut # 12 area to eonunence after establishing Ute roads. <br />The physical lay of Cut # 12 requires U1at it be nuned prior to Cut # 10 to avoid isolating this cut which <br />would require rnnswction of some access ramps at a later time. <br />We also plan [o extend Cut # 10 to the east sirrillar to Cut# 8 and widen Cut # ]0 by 2 SO feet to provide <br />better access and maneuverability. <br />These changes will be in addition to the Bond evaluation and upgrading we discussed on the telephone <br />on Augusl 13, 1997. <br />1f [can answer any questions please call or send "e-mail" to Rpatter G Holnam. Com <br />Sincerely, <br />/Ra%J/y P~4~attOerson <br />Quarry Supervisor <br />CC: Mr. Ken Hamm, Production Superintendam <br />Mr. Roy Stiemnier, Chief Geologist <br />