My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-02-11_REVISION - M1977208 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977208
>
2000-02-11_REVISION - M1977208 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:56:44 PM
Creation date
11/22/2007 1:33:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977208
IBM Index Class Name
Revision
Doc Date
2/11/2000
Doc Name
TR-001 PN M-77-208 LYONS QUARRY SOUTHDOWN INC RESPONSE TO SECOND ADEQUACY REVIEW
From
BANKS AND GESSO
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iuiiiiiiiiu iii • ~ <br />r~ Banks and Gesso, LLC 720 Kipling St.,Suite117 <br />^^ Lakewood, Colorado 80215 <br />(303)274-4277 <br />Fax (303)274-8329 <br />www. ba n ksandgesso. com <br />RECEryED <br />February 10, zooo FE9 ~ ~ 2pp0 <br />~~w., otMt~~a`Y <br />Christina Kamnikar <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />Subject: Technical Revision 001, Permit No. M-77-208, Lyons Quarry, <br />Southdown, Inc. Response to Second Adequacy Review <br />Dear Christina: <br />We are in receipt of your letter of January 28, 2000 and Southdown herein commits to <br />the requested provisions contained in that letter with the following clarifications. <br />Southdown will perform the required monitoring for five consecutive quarters and <br />thereafter the monitoring shall be twice per year as was stipulated in the previous <br />submittal. Southdown requests that the Division also consider the many years of pH <br />measurements taken at the discharge point from A-Pit pursuant to their CDPS permit. <br />This will provide additional baseline data. <br />The Division will set numeric water quality standards for the monitoring and compliance <br />point and Southdown requests that these be grounded in adopted State standards. <br />Southdown would also like the Division to consider ambient water quality in its setting of <br />numeric standards. <br />Aftcr the numeric standards have bear. set any exceedances will be reported to the <br />Division immediately. A written report will be submitted to the Division within five (5) <br />working days. <br />Please let me know if this is sufficient to approve the Technical Revision. <br />S' rely, <br />Paul Banks ~./ <br />PB/kj <br />Cc: John Lohr <br />
The URL can be used to link to this page
Your browser does not support the video tag.