Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 666-3567 <br />FAX: (303) 832-8106 <br />Mazch 6, 2003 <br />Mr. Frank Laughrey `~ <br />P.O. BOX 128 <br />Lake George, CO 80827 / <br />J J <br />Re: Tiger Timber Site, Permit No. M-1991-082, Succession Approval, Revision No. SO-1 <br />Deaz Mr. Laughrey: <br />DIVISION O F <br />MINERALS <br />GEOLOGY <br />RECLAMATION <br />MININ G•BA FETY <br />Bill Owens <br />Governor <br />Greg E. Walther <br />Executive Director <br />Ronald W. Cottony <br />Division DireROr <br />On Mazch 4, 2003, the Division of Minerals and Geology approved the succession of operators from Tiger Timber, <br />Inc. to Frank Laughrey for this operation. Frank Laughrey is now the permitted operator of the Tiger Timber Site, <br />and as such, is responsible for all provisions in Permit No. M-1991-082, as well as those speciFed in the Rules and <br />Regulations. Tiger Timber, Inc. is relieved of all responsibilities concerning this operation. <br />Please Note: <br />1. All of the application materials, as amended and supplemented, aze an integral part of your permit. They <br />have been incorporated into the permit by reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you keep a copy ofi the peialit and the <br />permit application at the mining operation as a reference for operating personnel, to help ensure compliance with <br />the terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those described in the permit may <br />require a modification to the permit. We suggest consulting the Rules and Regulations and/or contacting us to <br />determine if a modification to the permit is necessary. Rule 1.10 pertains to Amendments, Rule 1.9 to Technical <br />Revisions, and Rule 1.11 to Conversions. <br />3. On your permit anniversary date each yeaz, you must submit an annual fee and annual report to us, Please <br />consult the Rules, Act, and your permit for specific requirements. <br />If you have any questions, contact me. <br />Sincerely, <br />~I f Harry osey <br />Acting Senior Environmental Protection Specialist <br />cc: Frank Laughrey, Tiger Timber, Inc. <br />M:bss~SME\TEMPN-I-SO-06_M 1991082 CBM_20030306_10013 PM.doc <br />