My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV105960
DRMS
>
Back File Migration
>
Revision
>
REV105960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:18:00 AM
Creation date
11/22/2007 1:30:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
8/8/1996
Doc Name
WEST ELK MINE PN C-80-007 PROPOSED DECISION MINOR REVISION 190 REFUSE PILE TOPSOIL SUBSOIL PLAN
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
MR190
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r ~• III IIIIII III IIII III <br /> 999 <br /> STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl of NaNral Resources , <br />131 7 Sherman St., Room 21 5 <br /> <br />Denver, Colorado 80203 Ii~ <br /> <br />Phone: 13031 B66-3567 I <br />FAX: 1]031 8328106 <br /> DEPARTMENT OF <br /> NATURAL <br />August 8, 1996 RESOURCES <br /> Roy Romer <br />Christine E. Johnston c°°er^°r <br />Mountain Coal Com an <br />P Y Tames S. Lochhead <br /> Execulrve Director <br />P.O. Box 591 Michael B Long <br />Somerset, Colorado 81434 D~~i~ion Director <br />Re: West Elk Mine (Permit No. C-80-00'n <br />Proposed Decision -Minor Revision No. 190 <br />Refuse Pile Topsoil/Subsoil Plan <br />Dear Ms. Johnston: <br />The Division of Minerals and Geology found your application for Minor Revision No. 190 to be <br />complete on August 6, 1996, and issued the proposed decision on the same date. The Proposed <br />Decision Form is enclosed. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The <br />material should be sent within 15 days of final approval. <br />If you have any questions, please contact me. <br />ulay <br />Protection Specialist <br />MPB/bjw <br />Enclosure <br />c/enc: Lawrence Kline, OSM <br />\elw\MR190.007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.