Laserfiche WebLink
• III Illlllllllllllll • <br />999 <br />OF COLOlZADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />1313 Sherman Street, Room 818 <br />Denver, Colorado 80?03 <br />Phone: 1303) 866-3581 <br />FAX: (303) 866-3589 <br />hup l/eaterstate,co.us/delau It. htm <br />pUG 2'~ 1999 ~ `°t°p <br />ti~ <br />g Geo1o9V ~e ~ ~~ <br />pivision of Murals • 4~` <br />~ (876 <br />Response to Reclamation Permit Application Consideration <br />DATE: August 27, 1999 <br />TO: Thomas D. Gillis, Senior Environmental Protection Specialist <br />CC: Division 4 Office; District 42 Water Cornmissioner <br />FROM: Jeff Deatherage, P.E.~I7 <br />RE: Whitewater Pit 500, File No. M-77-129 <br />Operator: Whitewater Building Materials Corp., <br />Contact: Stevan O'Brian (303) 423-7297 <br />Section 29, Twp 12 South, Rng 99 West, bth P.M., Mesa County <br />Bill Owens <br />Governor <br />Creg E Watcher <br />Executive Dnector <br />Hal D. Simpson, P.E <br />State Engineer <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. <br />® The proposed operation will consume ground water by: ®evaporation, ^ dust control, ^ <br />reclamation, ®water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit <br />or other type of well permit, as applicable. <br />® Prior to approving a well permit, the applicant must conduct a field inspection of the site and <br />document the locations of all wells within 600 feet of the permit area. The applicant must then <br />obtain a waiver of objection from all well owners with wells within 600 feet of the permit area or <br />request a hearing before the State Engineer. <br />® Other: Water is currently available for appropriation at this location, thus a well permit may be <br />available without a water court approved plan for augmentation. <br />COMMENTS: The applicant may contact the State Engineer's Office with any questions. <br />