My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV104060
DRMS
>
Back File Migration
>
Revision
>
REV104060
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:15:05 AM
Creation date
11/22/2007 1:13:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981033
IBM Index Class Name
Revision
Doc Date
12/12/1997
Doc Name
TR 25 BEAR MINE 3 PN C-81-003
From
DMG
To
J E STOVER & ASSOCIATES
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />iii iiiiiiiiiiiii iii <br />STATE OF COLU~`n~~ <br />DIVISION OF MINERALS AND GEOLOGY <br />DCparlmenl OI Yalurll RPSOUr[M <br />I l I'4 Sherman SL. Room ? 15 <br />Denver, Culumdo tl0?03 <br />Phuno~. I'41111 Uhh.l5h7 <br />FAk. l III 11 tliL~H lllh <br />December 12, 1997 <br />Bear Coal Company <br />c/o Mr. Jim Stover <br />J.E. Stover & Associates <br />2768 Compass Drive, Suite 101 <br />Grand Junction, CO 81506 <br />I~~~~ <br />DEI'AkTMENT OF <br />NATURAL <br />RESOURCES <br />Fov Rnmcr <br />Gnernnr <br />Inures 5 Lnt hheaJ <br />Eawive Dircno~ <br />hL(hael B. Lung <br />Drvisinn Dueaor <br />~ C.~r,- r-~, <br />~r~~~-I ` . i I 1 <br />~' rz ti 7~ ~--~ <br />Re: Technical Revision No. 25; Bear Mine No. 3; Permit Ho. C-81-003 <br />Dear Mr. Stover: <br />The Division has completed a preliminary review of Beaz Coal Company's application for <br />Technical Revision No. 25 (TR-25), and has the following comments regarding the adequacy of <br />the application. <br />The Division is concerned with the proposed location of the pond, since it is at the toe of <br />an active slide. Bear Coal Company should consider constructing the pond in a more <br />stable area, and if such an azea would not be feasible, document that this is the case. <br />Please consider alternate locations for the pond or consider adding the discharge into the <br />existing site pond. <br />2. Has Bear Coal Company applied for a new outfall under their CDPS permit, or will an <br />existing outfall location be modified? The Division will need a copy of approval for the <br />discharge from the CDPHE before this revision can be approved. <br />Does Bear Coal Company intend to treat the mine water prior to discharge? If so, please <br />provide information regarding the treatment process. -. <br />4. Please provide additional information as to how the water from the slide area will be <br />directed to the pond. If structures, such as pipes or channels are to be installed, design <br />information must be included in the revision application. <br />~. The design information for the pond does not appear to consider any storm water inflow. <br />If the pond is not intended to treat any surface runoff, a diversion ditch will need to be <br />designed and constructed, and storm water considered for the pond surface and area <br />between the diversion and pond only. <br />
The URL can be used to link to this page
Your browser does not support the video tag.