My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV103040
DRMS
>
Back File Migration
>
Revision
>
REV103040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:47 AM
Creation date
11/22/2007 1:02:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
12/14/1998
Doc Name
TRAPPER MINE PN C-81-010 PHASE II PORTION OF BOND RELEASE APPLICATION 1 SL-1
From
DMG
To
OSM
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.~ : iii iiiiiiiiuiii iii <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparlmenl of Natural Resources <br />1111 Sherman 51., Room 215 <br />Denver, Colorado 80203 <br />Phone: 131111 AbbJ56: <br />FAX: U03) 83?8106 <br />December l4, 1998 <br />Mitchell S. Rollings <br />Office of Surface Mining <br />Western Regional Coordinating Center <br />1999 Broadway, Suite 3320 <br />Denver, CO 80202-5733 <br />Re: Trapper Mine (Permit No. C-81-010) <br />Phase II Portion of Bond Release Application No. 1 (SL-1) <br />Dear Mr. Rollings: <br />~I~ <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br />Rov Romer <br />Governor <br />lames 5 lochhead <br />Erecuuve Dneanr <br />hLChael B. Loop <br />Drcision Detector <br />The Colorado Division of Minerals and Geology has issued a proposed decision to approve the. Phase <br />II portion of Bond Release Application No. 1 at the Trapper Mine. This decision will become final <br />at the close of the thirty (30) day public comment period, which commences with the initial <br />publication in the Crnig Dni[y Press. A copy of the proposed decision and written findings is <br />enclosed. <br />Since this mine is a federal mine, our decision is subject to the concurrence of OSM, and the <br />signature of an authorized OSM representative is required for release of the bond. Therefore, the <br />Division respectfully requests that OSM notify the Division of concurrence or nonconcurrence prior <br />to the end of the public comment period, in accordance with the agreement dated June 30, 1997, <br />Procedures for Cooveratine State and Federal Aeencies to Provide Mutual Concurrence on the <br />Release of Performance Bonds from Federal Lands Coal Mining Operations. <br />If you have questions or need of additional information, please contact me. <br />Sincerely, <br />T.o..~. ~L-t'c~i,...~+~4 <br />Tom Kaldenbach <br />Envirorunental Protection Specialist <br />TAK/JRC <br />Enclosure <br />M AOSSU RCITEAIP~CSL 12010.TAK <br />
The URL can be used to link to this page
Your browser does not support the video tag.