My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102685
DRMS
>
Back File Migration
>
Revision
>
REV102685
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:13:21 AM
Creation date
11/22/2007 12:58:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
8/31/1992
Doc Name
BATH HOUSE FACILITY MODIFICATION MR 92-77 PN C-82-056 FOIDEL CREEK MINE
From
CYPRUS YAMPA VALLEY
To
MLRD
Type & Sequence
MR77
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C c~~us <br />~ Yampa Valley <br />iiiiiiiiiiiiiiiiiii <br />Cyprus Yampe Valley Coal Corporation <br />29587 Routt County Road #27 <br />Oak Creek, Colorado 80467 <br />303-879-3800 <br />August 28, 1992 <br />Kent Gorham <br />Reclamation Specialist <br />Mined Land Reclamation Division <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />Dear Mr. Gorham; <br />RECEIVEC~ <br />AUG 311992 <br />Drv ~~~..~~. <br />MINERALS e i;EU~UGY <br />Re: Bath-house Facility Modification, Minor Revision 92-77; Permit C-82- <br />056, Foidel Creek Mine <br />Per our discussion of August 24, TCC is submitting the referenced minor revision for <br />the proposed bath-house facility modification. <br />As previously stated, the proposed facility would replace the current bath-house <br />trailers, and would be constructed adjacent to the operations center as indicated on <br />enclosed Map 24 (Surface Facilitiesl. The trailers should be removed during the <br />summer of 1993, with a portion of the resulting open area becoming part of the <br />parking lot. Water and sewer lines from these trailers will be capped and covered. It <br />is anticipated that the area encompassed by current bath-house trailers 2-4 will be <br />graded and left alone. All areas to be affected are previously disturbed and are <br />contained within the current sediment control system. No changes to the current <br />sediment control system are anticipated as a result of this revision. <br />Approximately 3,000 cubic yards of material will be removed during over excavation <br />of foundations and slab, and approximately 400 yards of compacted backfill material <br />will be used for the foundations and slab. In addition, some 850 tons of gravel will be <br />compacted for use beneath the foundations and slab. No other excavation work is <br />planned. A limited amount of additional dirt work will include contouring of the parking <br />lot area where the current administration trailer and parking is located, and a possible <br />widening of the access road by some 2-5 feet should this become necessary in the <br />area of the new bath house facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.