My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV102155
DRMS
>
Back File Migration
>
Revision
>
REV102155
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 1:12:45 AM
Creation date
11/22/2007 12:52:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Revision
Doc Date
10/6/2004
Doc Name
Proposed Decision Letter & Form
From
DMG
To
Seneca Coal Company
Type & Sequence
TR25
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1373 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />October 6, 2004 <br />COLORADO <br />DIVISION OF <br />MIN aRALS <br />GEOLOGY <br />EECLAMATION•MINING <br />SAFETY•SCIENCE <br />Blll OWEnS <br />Governor <br />Russell George <br />ROy A. Kazo Executive Director <br />Seneca Coal Company Ronald W. Cottony <br />P.O. BOX 670 Division Director <br />Hayden, CO 81639 Natural Resource Trustee <br />Re: Yoast Mine (Permit No. C-1994-082) <br />Proposed Decision -Technical Revision No. 25 (TR-25) <br />Additional Postmine Channel (YPM-13), Revised PMT for Valora Pit, and a Variance <br />Request for Delay in Contemporaneous Reclamation for Rough Backtill and Grading <br />Dear Mr. Karo: <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 25 at the Yoast Mine. Notice of the proposed decision will be published in the Steamboat Pilot as <br />soon as possible. The first publication will initiate the ten (10) day public comment period for the <br />Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />Please refer to the Performance Rnnd heading on the enclosed proposed decision form. If the amount of <br />Bond Held equals or exceeds the Revised Liability, you need not submit additional bond. However, if the <br />Revised Liability exceeds the Bond Held, please submit additional bond or rider to your existing bond <br />that equals or exceeds the Revised Liability. The revision will not be final until the bond is approved by <br />the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />Michael P. Boulay <br />Environmental Protection Specialist <br />MPB/Ahd <br />Enclosure <br />cc: Cazl Johnston, Office of Surface Mining, with enclosures <br />M1000A hdAt ~(`-TRAfi C19940RJ MPR JOOd tOpfi 1e019~ AM dnr <br />Office of Office of Colorado <br />Mined Land Reclamation Ac[ive and Inactive Mines Geological Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.