Laserfiche WebLink
Kennecott <br />Energy <br />January 31, 2005 <br />Mr. Byron G. Walker, P.E. <br />Environmental Protection Specialist <br />Colorado Division of Minerals & Geology <br />1313 Sherman Street -Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 <br />Colowyo Coal Mine <br />5731 State Highway 13 <br />Meeker, Colorado 81641 <br />Telephone: (970) 824-1579 <br />Fax: (970) 824-1598 <br />Tay Tonoul <br />Environmental Engineer <br />RECf~~~E~ <br />JAN ~ " 2005 <br />Division of Minerals and Geology <br />RE: Raptor Protection Schedule. Colowyo Coal Mine, Permit No. C-81-019. <br />Dear Mr. Walker, <br />Colowyo is submitting one revision to our permit, identified as MR-70. This revision is <br />necessary to update our permit with current information that representing the retrofitting of raptor <br />protection to existing power line structure residing within the Colowyo permit boundary. <br />Enclosed you will find three (3) copies of the proposed revised/new text, the appropriate <br />application form, and a change of index sheet to ease the incorporation of this revision into the <br />Permit. <br />The Revised text pages have been formatted in accordance with the new digitized revision of <br />permit number C-81-019, also known as MR-68, and are intended to update that version when it <br />is deemed approved. <br />If you have any questions or just require additional information, please don't hesitate in <br />contacting me at the phone number above. <br />Sincerely, <br />/~/} <br />Tay To ozzi v <br />Environmental Engineer <br />Encl. 3 copies <br />Cc: file CF 1.1.1.55 2004 wlencl <br />Public Permit w\encl <br />Antelope Mine • Colowyo Mine • Cordero Rojo Mine • Jacobs Ranch Mine • Spring Creek Mme <br />A member of the Rio Tinto Gx'oup <br />