Laserfiche WebLink
<br /> -~ iii iiiiiiiiiiiiiiii <br /> <br />Moffat Bond Liability Under Present Release Criteria <br />RECLAMATION CATEGORY Units CosUunit <br />Final Pit Area Greding <br />Moffat 3600 ft $123.78 $ 445,606 <br />Spoil Grading <br />Moffat 24.79 ac $1,894.26 $ 46,959 <br />Final Grading <br />Moffat 99.17 ac $1,650.44 $ 163,674 <br />Drainage Restablishment <br />Moffat $ 144,575 <br />Sediment Pond Removal <br />Moffat Pond $ 9,961 <br />Collection Ditches $ 369 <br />Topsoil Replacement <br />Moffat 150.5 ac $2,242.50 $ 337,496 <br />Revegetation <br />Moffat <br />Fertilizer 150.5 ac $46.03 $ 6,928 <br />Contour Furrows 150.5 ac $29.42 $ 4,428 <br />Permanent Mix 342.5 ac $208.13 $ 71,285 <br />Woody Stems 342.5 ac $1,392.00 $ 476,760 <br />Reseeding 150.5 ac $2D8.13 $ 31,324 <br /> $1,739,365 <br />CONTINGENCIES, PROF. SERVIC ES, MGMT COSTS <br />A Mobilization & Demobilization 10% of Line Items $ 173,937 <br />B Contingencies 10% of Line Items $ 173,937 <br />C Hard Costs Line Items +A+g $2,087,238 <br />D Engineering Costs 10% of Item C $ 208,724 <br />E Reclamation Mgt 8 Admin 5.1 °h of Item C $ 106,449 <br />F Profit 8 Overhead 18.5°h of Item C $ 386,139 <br />G ConVactor Supervision 2.5% of Item C $ 52,181 <br />Total Bond <br />Bond Release Amounts <br />Phase I (1996 or 1997) 60% of Area Total $1,704,439 <br />Remaining Reclamation Categories <br />Sediment Pond Removal <br />Moffat Pond $ 9,940 <br />Collection Ditches $ 369 <br />Topsoil Replacement <br />Moffat 150.5 ac $2,242.50 $ 337,496 <br />Revegetation <br />Moffat <br />Fertilizer 150.5 ac $46.03 $ 6,928 <br />Contour Furrows 150.5 ac $29.42 $ 4,428 <br />Permanent Mix 342.5 ac $208.13 $ 71,285 <br />Woody Stems 342.5 ac $1,392.00 $ 476,760 <br />Reseeding 150.5 ac $208.13 $ 31,324 <br /> <br />$2,840,732 <br />Ta La.e <br />T Ck-G(. aY .~~C.LLI~br <br />Caiv, , ,,. o- lii Uf ..r n .~{ <br />Page 1 of 2 <br />