My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99862
DRMS
>
Back File Migration
>
Revision
>
REV99862
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:41 AM
Creation date
11/22/2007 12:31:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Revision
Doc Date
7/17/2001
Doc Name
POWDERHORN COAL CO MR 049 LOADOUT OPERATION BY LODESTAR PERMIT C-81-041
From
J E STOVER & ASSOCIATES
To
DMG
Type & Sequence
MR49
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES <br />2788 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (970) 245-4101, FAX 242-7908 <br />MINE ENGINEERING <br />MINE RECLAMATION <br />July 16, 2001 <br />Dan Mathews <br />Division of Minerals and Geology <br />101 South 3rtl Suite 301 <br />Grand Junction, CO 81501 <br />Re: Powderhorn Coal Company <br />Minor Revision 049 <br />Loadout Operation by Lodestar <br />Permit C-81-041 <br />Dear Mr. Mathews: <br />iii iiiiiiiiiiiu iii <br />CIVIL ENGINEERING <br />CONS7. MANAGEMENT <br />~f~.G'L"vi[~yy. <br />~`~hr~. , <br />' JUL > > 11b1 <br />The DMG's letter dated July 13, 2001, transmitted its comments regarding the referenced <br />minor revision. Following are PCC's responses to the DMG's comments and concerns: <br />Lodestar has a coal contract with TVA for a period of 12 months. Operation of the <br />loadout is to begin during July or August, 2001 and end in July or August, 2002. <br />Contract extensions are probable. <br />The DMG requested a commitment to initiate reclamation of the loadout and <br />railroad spur in accordance with Figure 14-1 within various time periods. Page 14-1 <br />was revised accordingly. Page 14-1 was also amended to state that all portions of <br />the mine site, other than the loadout and railroad spur, will remain in permanent <br />cessation so the reclamation timetable specified in Figure 14-1 will not be effected <br />by the loadout operation. <br />3. The statement on amended page 13-5 was corrected. The 2001 calendar year is <br />Year 1 of the reclamation schedule. The paragraph regarding the reclamation <br />schedule was moved to amended page 14-1 <br />4. Page 13-5 was revised to indicate up to 50,000 tons will be stored at the loadout at <br />any one time. Enclosed is an updated Construction Permit, numberl l-ME-670-1 F, <br />for the loadout to be incorporated into the permit at Appendix 16-1. The <br />Construction Permit has the following limitations: <br />a. Coal transfer from the Unit Train Loadout by truck shall not exceed 300,000 <br />tons per year, and 2,000 tons per day. <br />b. Coal transfer to the Unit Train Loadout by truck shall not exceed 200,000 <br />tons per year, and 2,000 tons per day. <br />
The URL can be used to link to this page
Your browser does not support the video tag.