Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />NEW ELK PREPARATION PLANT <br />STACKING TUBE <br />A metal stacking tube will be installed at the raw coal feed <br />stacker at the New Elk Preparation Plant. The stacker will consist <br />of a concrete base and a steel tube. The tube will connect to the <br />current conveyor system coming from the breaker building. The tube <br />will discharge the raw coal over the plant feeders. The tube will <br />control the free fall of the raw coal reducing the loss of coal <br />fines. <br />