My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV99270
DRMS
>
Back File Migration
>
Revision
>
REV99270
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:23:12 AM
Creation date
11/22/2007 12:24:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
3/22/1999
Doc Name
INTEROFFICE MEMO COLOWYO TR-47
From
JANET BINNS
To
BYRON WALKER
Type & Sequence
TR47
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flll IIIIIIIIIIIIIIII <br />INTEROFFICE MEMORANDUM <br />TO: BYRON W <br />FROM: JANET BlNNS <br />SUBJECT: COLOWY TR~7 <br />DATE: 03/22/99 <br />CC: DAN FiFRNANDEZ <br />I have reviewed Colowyo's application for a Technical Revision (TR-47). In this <br />revision Colowyo proposes to revise their internal revegetation monitoring schedule. <br />Permit page 4.15-1 is the only page submitted for revision. The proposed revision is in <br />compliance with Rule 4.15.1(4). <br />In the first sentence following citation 4.15.1(4) on proposed page 4.15-1 reference to <br />monitoring the success of mature shrub transplants has been eliminated. <br />Has Colowyo ceased live transplants of mature shrub clumps? Permit page 2.05-52 <br />still retains a commitment to establishing mature shrub clumps. The Division <br />requests that Colowyo continue to monitor success of mature shrub clumps. <br />The main change proposed in this revision is to commit to monitor vegetation in the <br />fourth growing season after planting and to eliminate monitoring every third year <br />thereafter. This revision is acceptable and in compliance with the regulations. <br />2. Colowyo proposes to submit "an assessment of the monitoring results in the Annual <br />Reclamation Report". The Division requests that the results be submitted not solely <br />Colowyo's assessment of the results. Please submit the monitoring information in the <br />annual reports. <br />Colowyo has not proposed to revise information found on page 4.15-2. Item No. 5 on <br />page 4.15-2 repeats commitments found on page 4.15-~. This page commits Colowyo to <br />taking corrective actions should sampling show problems with revegetation. This page_ <br />also commits Colowyo to submit the sampling information and not simply "Colowyo's <br />"assessment" of the monitoring data. If Colowyo does not intend to revise this page, <br />concern no. 2 should already be covered. If page 4.15-2 is not revised we do have some <br />repetitive text, however I would prefer to see the commitments found on page 4.15-2 to <br />remain than to ask the operator to revise this page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.