Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site EvaluatiolftECE~vE~ <br />State Program tdf,lt ~ , poop <br />1. Permittee/Person <br />BOWIE RESOURCES LIMITED <br />2. Address- - <br />PO BOX 1488 <br />3. City 4. State <br />PAONIA CO <br />5. Zi Cade 6. Phone Number <br />81428 (970)327-4135 <br />7. O erator Namq if Different than Permittee <br />8. Mine Name <br />BOWIE #1/ORCHARD , <br />9. Permit Number l0. Permit Type <br /> C-03848~ion of Nlitlerals 8 Gedogy PP <br />11. Field Visit Date 12. P ose 13. SRA Present <br /> 06/10/2003 OBR Y^ <br />mm-dd -yyyy <br />14. Permit Status I5. Site Status 16. Facility T e <br /> MC BEF <br />I7. OSn". Office # 18. CCID # I9. Land Code <br />140 ~ SF <br />20. M.S.H.A ID # 21. State Abrev. 22. County Name <br /> <br /> OS-01962 CO DELTA <br />23. AVS Permittee En tity [D Number 24. State Office <br />105415 <br />25. Hours 26. Sig~n`~~rJe Block /~ 27. Reviewing fficial: <br />1.0 a. Permit Review ;y~~--/~ ~ r ~4 ~ <br />Signamre: Signature: <br />7,p b. Site Visit Time RANDY PAHt ID # 997 <br />Review Date: ~ ( / ~Z/ ~ 3 <br />g,p c. Travel Time printed Name: <br />mm - dd - yyyy <br />q-p d. Report Writing Date: 40!06!2983 // - O •-ZdcJ3 Is Supplemental MSE Page Used Y/N Y^ <br />Permit Type -Item 10 IP =Intedm Program, PP =Permanent Program , NP = No Permit <br />Purpose Type Codes pem 12 CCR.... Citizen Complaint Referral (non site visit) <br />Oxx„.,Oversight RFx.... Reclamation Fees CC...... Citizen Complaim (initial site visit) <br />Axx.... Assistance Fxx..... Federal Actions CCF.... CNzen Complaim Follow-up <br />Joint Inspectbn -Item 73 A joint inspection is when a state inspector accompanies an OSM inspector any Ume tludng Ne review of the mine site. <br />Permit Status -Item 14 AB....Abandoned: All surface and underground coal mining activities have ceased and <br />operator has left the site without completing reclamation as defined in <br />A.... Active: Coal mining and reclamation activities occurring or 30 CFR 840.11(8) ~ ~ ' <br />ppermitted but not yet disturbed. AB7.. Bond Forfeiture: Bond fortelture ot8cially in process or completed, and. <br />IN....Inactive (Permanent Program Permit): Phase II completed or reclamation in progress or not yet commencetl. <br />Temporary Cessation of Operations. (Intedm Program Permit) AB2..Partialty Redatmed Forfeiture: Forfeited site where all bonds have been <br />Coal mining completed and reclamation activities initiated. used to reclaim site, but site not reclaimed to Program standards. <br />BR... Bond Release: Reclamation comppleted and State Regulatory ~ A83..Reclaimed Fodeiture: Forfeited site that has been reclaimed to Program standards. <br />Authority (RA) has releasetl all of the bond (Phase III Release.) NA..NOt Applicable: When site is unpermiUed. <br />Site Status Codes -Item 15 NS.. Non-Site ~sil: Status of she not determined. <br />ND._No Disturbance: No coal mining and reclamation MC..Mining Complete: No mining activity on site, FP., Fodeiture Pending: The RA is pursuing <br />operations have been started. site regraded and awaaing pphose bond release. actions to revoke the permit, tolled the <br />EX..Coal 6cploraUen: Coal exploration operations TG..Temporary Cessation; The RA has granted pertormance bond(s), andlor redama- <br />have started and where coal mining operations cessation of mining pursuant to 30 CFR 816! tion of forfeited site is in progress. <br />have not begun. <br />i <br />l 817.131(b). <br />P1 <br />Ph <br />1 R <br />l <br />At <br />P <br />I b <br />d <br />l FR.. Fodeited and Redatmed: Forfeiture <br />l <br />t <br />i <br />l <br />d <br />ng: Coa <br />aurtace mining <br />AP.. Active Coal Produc .. <br />ase <br />e <br />ease: <br />on <br />re <br />ease <br />least <br />hase rec <br />amat <br />on wmp <br />e <br />e <br />. <br />activdies are occurring. granted for entire permitted area. For interim FO.. Abandoned Site: Abandoned site that <br />qN.. Active Non-Producing: Active non-produdng penults, partial bond release. is permitted lwt there is no bond. <br />fadlity such as Uppie or preparation plant. <br />t <br />i <br />Th <br />P <br />i <br />S <br />i <br />i <br />i <br />i P2.. Phase II Release: At Least Phase II bond release <br />ti <br />f <br />th <br />iU WC. Wiltlcat: Coal mining and reclamation <br />d <br />i <br />h <br />t <br />ki <br />l <br />erm <br />t <br />ta <br />us <br />ve, s <br />te <br />s <br />ning: <br />e <br />s al <br />NM..No M e en <br />re penn <br />or <br />ed area. operat <br />ave or are <br />ace an <br />ons <br />a <br />ng p <br />not in Temporary Cessation, no surace coal P3.. Phase III Release: Reclamation completed and the activity is not covered byy the <br />minino activity. and site no/ regraded. the RA has released ail bond. reouired permits from the RA. <br />'aeility Type Codes -Item 16 D...Ancillary (Haulroad, Conveyor, andlor Rails) H...Exploration Permits L... Remining site ppermitted <br />A... Surface E... Refuse and/or Impoundment 1... Nouce of Intent to Explore under 36 CFR785.25 <br />B... Underground F... Loading Facility andlor Tipple J... Exempt 16 and Z3 <br />C... Preparation Plans G... Stockpiles K... Government Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBi2EFA) <br />Your Comments Are Important <br />The Small Business and Aariculturc Regulatory Enforcement Ombudsman and ]0 Regional Fairness Boards were established to n:ceive comments ~o <br />small businesses about Federal agency enforcement actions. The Ombudsman will annually evaluate the enforcement activities and rate each afenc 's <br />responsiveness to small business. If you aze a small business (a business with 500 or fewer employees inchtding those of affiliates) page 1 of <br />and wish to comment on the enforoement or compliance aetivnies of OSM, call )-888-REG-FAIR (I-888-734-3241). ae.a~nerm~ecs, w <br />