Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />999 <br />PROJECT IDENTIFICATION <br />Task # : 001 <br />Date : 10/31/2001 <br />User: LDO <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State :Colorado <br />County :Las Animas <br />Site :Winter Ranch Pit <br />PermiUjob# : M-1985-165 <br />Abbreviation :none <br />Filename : M 165-001 <br />Agency or organization name : DMG <br />Permit or other job action :bond review <br />Task description :reduce 11 feet highwall <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R - 8U Horsepower : 305 <br />Blade type :Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $43.30 NA <br />OperatingcosUhour : $66.26 100 <br />Ripper op. cosUhour : $0.00 NA <br />Operator cosUhour : $27.99 NA <br />Total unit cosUhour : $13756 Total fleet cost/hour : $137.56 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume: 3,679 BCY factor: 1.120 volume: 4,120 LCY <br />Source of estimated volume :estimate <br />Source of estimated swell factor : cat hndbk <br />HOURLY PRODUCTION <br />Average push distance <br />Unadjusted hourly production <br />Material consistency description <br />Compacted fill or embankment <br />Average push gradient <br />Average site altitude <br />51 feet <br />1,627.0 LCY/hr <br />Material weight <br />Weight description <br />Gravel - Pitrun <br />20.00 % (i <br />6.100 feet <br />3,250 Ibs/LCY <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />JOB TIME AND COST <br />Fleet size : 7 Dozers) Total job time <br />Unit cost : $0.194 /LCY Total job cost <br />• • <br />0.75 <br />0.90 <br />1.10 <br />1.00 <br />0.83 <br />0.70 <br />1.43 <br />1.00 <br />0.71 <br />1.00 <br />0.44 <br />Source <br />708.17 LCY/hr <br />708.17 LCY/hr <br />5.82 Hours <br />$800 <br />