Laserfiche WebLink
<br /> <br />~~ III IIIIIIIIIIIII III <br />999 <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY ~, <br />Department of Natural Resources v <br /> • <br />1313 Sherman St., Room ?I S ;s <br />Denver, Calor,¢ia 80?03 <br />Phane~ (7031866-3567 <br />FAY: (3031 83:-8106 <br /> DEPARTMENT O <br /> NATURE <br /> RESOURC ~` <br /> Roy Romer <br /> Governor <br /> lames 5. Lnchhead <br /> <br />February 17 <br />1999 Esecuuve Oheaor <br />, michael B. Lonq <br /> Dieision Dvecmr <br />Robert Soby <br />1701 4175 Drive <br />Paonia, CO 81428 <br />RE: Technical Revisions Nos. 6 and 7, Bowie No. 2 Mine, Bowie Resources Ltd., <br />Technical Revision No. 30, Bowie No. 1 Mine, Bowie Resources Ltd. <br />Dear Mr. Soby: <br />This letter is to inform you, as a person who commented on the above-mentioned technical revisions, <br />that there has been a change in the submittal of this information. For the Bowie No. 2 Mine, Bowie <br />Resources has withdrawn Technical Revision No. 6, which involved the installation of a downhill <br />conveyor, coal stockpile and truck loadout and the relocation of a sedimentation pond and Technical <br />Revision No. 7, which involved the change in the mine plan to go to longwall mining with an <br />increase in production from 2 million tons per year to 5 million tons per year. For the Bowie No. 1 <br />Mine, Bowie Resources also has withdrawn Technical Revision No. 30, which concerned an increase <br />in production at the railroad loadout from 2 million tons per year to 5 million tons per year. <br />In place of the withdrawn Technical Revisions Nos. 6 and 7, Bowie Resources will resubmit the <br />information under one permit revision. The company and the Division chose to combine these two <br />permitting actions into one revision, in part, to accommodate the wishes of individuals such as <br />yourself, who have indicated a desire to meet with the Division to discuss the proposed mine plans. <br />Technical Revision No. 30 will be submitted at a later time, again, as a technical revision. Technical <br />Revision No. 30 can not be submitted under the forthcoming Bowie No. 2 Ivline permit revision since <br />it involves the Bowie No. 1 Mine and, therefore, has a different permit number. <br />Bowie Resources has indicated that they will be submitting [he Bowie No. 2 permit revision very <br />soon. At that time, the company will publish notice of their application in the Delta Counry <br />/ndependent for four consecutive weeks and place a copy of the revision application in the Delta <br />County Clerk & Recorder's Oftice. If you wish to submit comments on the proposed revision, you <br />may review the material at the courthouse and submit comments to this office, as indicated in the <br />public notice. if you wish to Have your original comments apply to the forthcoming revisions, please <br />