Laserfiche WebLink
~ III IIIIIIIIIIIII III ~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 51., Room 215 /I~` <br />Denver, Colorado 80203 ~ I Ir <br />Phone: (303) 866-3567 <br />FA%: (3031 83 2-81 06 <br />DEPARTMENT OF <br />NATURAL <br />July 25, 1995 RESOURCES <br />Roy Romer <br />Mr. James McFarland covernnr <br />C & M Aggregates Ltd Tames S. Lochhead <br />3609 S. Wadsworth Blvd Ste 3DD Ezecmive Director <br />Lakewood, CO 80235 M¢hael B. LOnR <br />Division Director <br />Re: Platte Valley Pit, Succession Approval, Permit No. M-89-120 Revision <br />No. SO-001 <br />Dear Mr. McFarland: <br />On July 12, 1995 the Colorado Mined Land Reclamation Board approved the <br />succession of operators from C & M Companies to C & M Aggregates Ltd for this <br />operation. C & M Aggregates Ltd is now the permitted operator of the Platte <br />Valley Pit:, and as such, is responsible for all provisions in Permit No. <br />M-89-120, as well as those specified in the Minerals Rules and Regulations. <br />C & M Companies is relieved of all responsibilities concerning this operation <br />(See Mineral Rules and Regulations Number 1.12). <br />The Division would like to remind you, as the permitted operator, about a few <br />things we feel are important: <br />1. All of the application materials, as amended and supplemented, are an <br />integral part of your permit. They have been incorporated into the permit by <br />reference. We presume that you have a copy of all of these materials; <br />therefore, none have been enclosed with this mailing. We suggest that you <br />keep a copy of the permit and the permit application at the mining operation <br />as a reference for operating personnel, to help ensure compliance with the <br />terms of the permit. <br />2. Changes in the mining and reclamation operations that differ from those <br />described in the permit may require a revision to the permit. We suggest <br />consulting the Mineral Rules and Regulations and/or contacting us to determine <br />if a revision to the permit is necessary. Rule 1.10 pertains to Amendments, <br />Rule 1.9 to Technical Revisions, and Rule 1..11 to Conversions. <br />3. On .your permit anniversary date each year, you must submit an annual <br />fee and annual report to us. Please consult Rule 1.15 for 110 Mineral <br />Permits, Rule 2.4 for 112 Permits, and Statute Section 34-32-116(1)(a) for 111 <br />Permits, for the specific annual report requirements applicable to your mine. <br />