My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV98043
DRMS
>
Back File Migration
>
Revision
>
REV98043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:14 AM
Creation date
11/22/2007 12:15:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987027
IBM Index Class Name
Revision
Doc Date
11/7/2000
Doc Name
CIRCES COST ESTMIATING SOFTWARE TRUCK LOADER TEAM WORK
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br />CIRCES Cost Estimating Software <br />TRUCK/LOADER TEAM WORK <br />, ., <br />~OJECT IDENTIFICATION <br />Agency or organization name : DMG <br />Task X : 001 State :Colorado PermiVjob a :M-1987-027 <br />Date : 11/07/2000 County :Custer Abbreviation :none <br />User : JD7 Sile :Hardship Lode Filename : M027-001 <br />Permit or other job action :Final Reclamation <br />Task description :place waste rack at base of pit walls <br />HOURLY EQUIPMENT COST <br />TrucWloader team -Truck <br />-Loader: <br />Support equipment -Load area <br />-Dump area <br />Road maintenance -Motor grader <br />-Water truck <br />sheet 1 of 2 <br />Shill basis : 1 per day <br />rric 12-18 cy, 6x4 <br />966E 5.2 High Lift <br />Cost Breakdown : rucWLoader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance Equipment <br />Motor Grader Water Truck <br />Import data filename : fruck2 loader NA NA NA NA <br />%Utilization-machine: 87 100 NA NA NA NA <br />-Ripper attachment: NA NA NA NA NA NA <br />Ownership cosVhour: $19.20 $28.54 NA NA NA NA <br />Operating cosVhour : $20.26 $26.17 NA NA NA NA <br />Ripper op. cosUhour: NA NA NA NA NA NA <br />Operator cosVhour : $21.55 $23.12 NA NA NA NA <br />Unit subtotals : $61.01 $77.82 NA NA NA NA <br />Number of units: 2 1 0 0 0 0 <br />Group subtotals : Work : $199.84 Support : $0.00 Maintenance : $0.00 <br />Total work team cosUhour : $199.84 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 50,407 CCY factor: 1.165 volume : 58,724 LCY <br />Source of quantity take-ott :calculation <br />Source of estimated swell factor :program <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Caoeclri <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 2,900 pounds/LCY <br />Descr.: Decomposed rock - 50°o rock. 50 % earth Struck volume : <br />Heaped volume : 12.00 <br />18.00 LCY <br />LCY <br />Rated payload : 48,000 pounds Average volume : 15.00 LCY <br />Payload capacity : 16.55 LCY Adjusted capacity : 75.00 LCY <br />Final adjusted truck capacity based on spe cific number of loader passes : 15.75 LCV <br />Loading Tool Capaelri • onditi r ti n Site altitude (H.) : 8.000 <br />Rated capacity (nom. heaped) : 4.500 LCY Truck Loader Source <br />Descr.: Loose material - 1' and over (85 - 90%) Altitude adj.: 0.970 1.000 (Cat HBJ <br />Bucket fill lactor : 0.875 Job efficiency : 0.830 0.830 (1 shiWday) <br />Adjusted bucket capacity : 3.938 LCY Net correction : 0.805 0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.