My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97989
DRMS
>
Back File Migration
>
Revision
>
REV97989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:22:12 AM
Creation date
11/22/2007 12:14:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
6/1/2007
Doc Name
Memo Regarding Reclamation Cost Estimate
From
Jim Stark
To
Joe Dudash
Type & Sequence
TR47
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 C O L O R A D O <br /> <br />Phone: (303) 866-3567 DIVISION OF <br />RECLAMATION <br />FAX: (303) 832-8106 MINING <br /> - &- <br /> SAFETY <br /> Bill Ritter, lr. <br /> Governor <br />INTEROFFICE HarrisD Sherman <br /> Executive Director <br />MEMORANDUM <br /> Ronald W. Cattany <br /> Division Director <br /> <br />TO: Joe Dudash Natural Resource Trustee <br />FROM: Jim Stazk ~-~~---~ <br />SUBJECT: Bowie No. 2 Mine Technical Revision 47 <br />DATE: 1 June 2007 <br />Attached is the reclamation cost estimate for the Bowie No. 2 Mine's Technical Revision <br />47 -new Hubbard Creek Vent Shafr. The estimate is six tasks (a summary sheet and <br />tasks 201-205) and represents an increase in liability of $148,686.00. The Division's <br />estimate is approximately $68,000.00 more than the estimate submitted by BRL with the <br />revision. The main reason for the increase is the calculated difference to plug the vent <br />shaft. BRL estimates a cost of $28,250.00 and the Division estimates a cost of <br />$99,376.00 for the shaft plugging. This difference arises from the difference in the cost <br />per cubic yard to fill the shaft. Again, BRL estimates the cost at $5.00 per cubic yard and <br />the Division estimates it at $15.44 per cubic yard. BRL does not give any reference for <br />their cost so it is impossible to determine it's accuracy. <br />Please let me know if you have any questions or need any additional information. <br />cc: Sandy Brown w/out attachments <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.