Laserfiche WebLink
iiii iiiiiiiiiiuiii <br />STATE OF <br />COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Department of Natural Resources <br />1313 Sherman 51., Room 215 <br />Denver, Colorado 80203 D I v t s I o N O F <br />Phone: (303) 866-3567 MINERAL S <br />FAX: (303) 832-8106 & <br /> GEOLOGY <br /> RECLAMATION <br /> <br />July 26, 2001 MINING•SAFETY <br /> Bil I Owens <br />Mr. Ray Miller covemo. <br />Baca County Greg E. Watcher <br /> <br />741 Main St. &eNbve Director <br /> <br />Springfield, CO 81073 Micnaele inng <br />Division Director <br />Re: Adequacy Requirements, Gunkel Pit No. 31, M-1993.088 <br />Dear Mr. Miller: <br />The Division completed a technical review of your conversion application. In order to meet <br />the minimum requirements of the ActJRules and Regulations, the following items need to be <br />addressed: <br />1. Pursuant to Rule 6.2; requirements (a), (b) and (c), the Exhibit maps must show the <br />name of the Applicant, must be signed by the person (s) who prepared the maps and <br />must give the date they were prepared. Please revise the maps. <br />2. The location description on Exhibit A does not correspond to the location information <br />on page 2, paragraph 9 of the application. The application states that the site is <br />located in Section 29, Township 28 South, Range 47 West. Exhibit A states that the <br />site is located in Section 25, Township 28 South, Range 47 West. Which location is <br />correct? <br />3. Exhibit B shows the site location east of lI5 highway 287. The other Exhibits show the <br />site west of 287. Which is correct? <br />4. Please provide the total excavated depth of each pit (north and south of Sand Creek). <br />5. It appears that mining activities will occur some distance from Sand Creek. If there is <br />a set back from Sand Creek, please provide the set back distance(s). If a set back is not <br />being proposed, please describe how the Creek will be protected. <br />6. You propose to install a diversion dike to divert stormwater runoff to a "safe disposal <br />site." What is a "safe disposal site" and where will it be located? The structure must be <br />shown on the maps. If the disposal site is a retention pond (collection pond), you <br />need to provide construction specifications. <br />Where will the diversion dike be located? It, too, must be shown on the maps. How do <br />you propose to construct the dike? What are the dimensions of the dike? <br />