My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REV97493
DRMS
>
Back File Migration
>
Revision
>
REV97493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2016 3:21:50 AM
Creation date
11/22/2007 12:09:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Revision
Doc Date
10/29/1997
Doc Name
WEST ELK MINE PN C-80-007 PROPOSED DECISION TR-81 LONE PINE MINE WATER TREATMENT POND
From
DMG
To
MOUNTAIN COAL CO
Type & Sequence
TR81
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iii iiiiuiiiiiuiu <br />STATE OF COLviv~uU <br />• DIVISION OF MINERALS AND GEOLOGY <br />Deparlmem of Natural Resources <br />1711 Sherman 51 . Rwm 215 <br />Denver, Culumdu 817107 <br />Phone: (1031 ftfi4-7567 <br />FA%: 130 D ft72-H Wfi <br />October 29, 1997 <br />Christine Johnston <br />Mountain Coal Company <br />P.O. Box 591 <br />Somerset, CO 81434 <br />Re: West Elk Mine (Permit No. C-80-007) <br />Proposed Decision -Technical Revision No. 81 <br />Lone Pine )Mine Water Treatment Pond <br />Deaz Ms. Johnston: <br />~~ <br />DEPARTMEf~fT OF <br />NATURAL <br />RESOURCES <br />Roy Romer <br />Governor <br />fames 5. Lochhead <br />E.eculrve Dueaor <br />Michael B. Long <br />Division Dupcior <br />Enclosed you will find the Division of Minerals and Geology's Proposed Decision for Technical Revision <br />No. 8l at the West Elk Mine. Notice of the proposed decision will be published in the Delta County <br />Independent as soon as possible. The first publication will initiate the ten (10) day public comment period <br />for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved revision <br />application was sent to the Office of Surface Mining and the Bureau of Land Management. The material <br />should be sent within 15 days of final approval. <br />The estimated liability amount of $43,465.00 for Technical Revision No. H 1, when added to the existing <br />liability amount of $ l0?45,670.00, exceeds the performance bond held. If you have not already done so, <br />please submit additional bond in the amount of $89,135.00. The revision will not be final until the bond <br />is approved by the Division. A copy of the Division's cost estimate is enclosed. <br />[f you have any questions, please contact me. <br />Sincerely, <br />~~ <br />Michael P. Boulay <br />6'f Environmental Protection Specialist <br />MPB/JRC <br />Enclosure <br />cc: Lawrence Kline, Office of Surface Mining, with enclosures <br />M.\UStiVRLITCMPCTROhU07MPB <br />
The URL can be used to link to this page
Your browser does not support the video tag.