My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-22_REVISION - M2001054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001054
>
2007-08-22_REVISION - M2001054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 12:32:52 PM
Creation date
11/21/2007 11:57:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001054
IBM Index Class Name
REVISION
Doc Date
8/22/2007
Doc Name
FWR Request
From
Bridalveil Construction
To
DRMS
Type & Sequence
SL1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s~~~ <br />8/15/07 <br />Bridal Veil Pit <br />Emery Lynn Olin <br />PO Box 1821 <br />Ouray, CO S 1427 <br />970-729-1823 <br />j Division of Reclamation, Mining and Safety <br />701 Camino del Rio <br />Room 125 <br />Durango, CO 81301 <br />Attn: Bob Oswald <br />Phone 970-247-5193 <br />FAX 970-247-5 I04 <br />RE: Mine ID # M-2001-054 <br />Reclamation Complete <br />Dear Mr. Oswald, <br />~W~A ~ s~- <br />--- - ~L <br />Re~~e~ <br />/~(IG 2 2 2007 <br />iy ~uon,'a ~Fy~~~ <br />S a,,~ 3y ~api8n~ <br />p~rt"~ucl) <br />AUG 2 7 2001 <br />pivision of Reclamation, <br />Mining and Safety <br />~ L- ~ / <br />I am requesting a final inspection for total reclamation of the Bridal Veil Pit. <br />Enclosed is a copy of the Reclamation Plan from the original Permit Application. <br />The three benches are complete with 3:1 slopes. As per reclamation plan, the regazded north <br />highwall has been reclaimed and grass planted as specified. The other west and south facing slopes <br />have also been planted with grass, but this was not a required part of the reclamation plan. <br />As per Reclamation Plan, all access roads remain intact. <br />The chatmel is complete to specifications with riprap as specified. The sediment pond has been <br />constructed to the proper dimensions. <br />There is a pile of material on the upper bench which was cleaned out of the channel and sediment <br />pond within the past month. It is placed in an area which will be used for commercial use, and does <br />not hinder the reclamation. Other construction equipment is on site for use in disposing of the <br />material and for the commercial use of the property as indicated in the Reclamation Plan. <br />Please contact me regarding your inspection date at 970-729-1823. <br />~~`--~~ <br />>/~~ ~ <br />Lynn Olin <br />Bridal Veil Construction LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.