My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-09-21_REVISION - M2001054
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2001054
>
2004-09-21_REVISION - M2001054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2021 12:32:52 PM
Creation date
11/21/2007 11:52:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2001054
IBM Index Class Name
Revision
Doc Date
9/21/2004
Doc Name
Comment Responses
From
Forsgren Associates Inc
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FORSGREN <br />- ASSOCIATES /INC. <br />ACOMPANYOF ENGINEERS AND SCIENTISTS <br />September 16, 2004 <br />fi't' ~ ~~' <br />SFp 2 j ?004 ,a°. <br />~~sio uo fn9o Fjeid <br />rYrine.~is ~cg,D9y <br />R <br />Mr. Bob Oswald <br />Environmental Protection Specialist <br />~ ~' Colorado Division of Minerals and Geology <br />• ~~ 701 Camino del Rio, Room 125 <br />Durango, CO 81301 <br />SFp C~c~~~® <br />of rlsi0 ~~ <br />.~ °/MeP/8id8HrCBp7pgY <br />4 <br />RE: Bridal Veil Construction Technical Revision M-2001-054, TR-01 -Comment <br />Responses>~_ - _ - ~ - - - $~ e- ' V~~ ~`~~ -- --- <br />Dear Bob, ~t <br />Pursuant to our conversations, please find below responses to our comment for the <br />Technical Revision noted above. I apologize for the delay in getting these to you and <br />appreciate your working with both Forsgren Associates and our client Bridalveil <br />Construction. <br />Comment Responses: <br />Response 1.-All materials used to increase the elevation of bench 1 will be generated <br />on site and will consist of oversize from the 1-inch screening process. <br />Response 2. -Lifts will consist of 1 - 3' in depth. Due to the angular nature of the <br />material, and the interlocking of the aggregate, stability issues are not expected. <br />Material will be smoothed into lifts and then compacted by a minimum of 3 time passes <br />of a tire or tread from rubber tired equipment. This same procedure with the same <br />material was used recently on the Bridalveil Townhome project and produced excellent <br />subbase for the foundation. Due to the blocky nature of the material, typical compaction <br />-.,testing procedures such as a nuclear density_gauge or sand cone cannot be used to _ _ <br />determine final dry densities. Additionally, a standard proctor cannot be completed on <br />this type of material. <br />Response 3. -The out-facing (west) slope will be graded to blend naturally with the <br />native ground. It is expected that is grade will be 1:5:1. This will be labeled on the map. <br />Response 4. -The northern access road has been eliminated. This included <br />completely removing the access turnout from U.S. Hwy. 550 as well as digging the <br />approach out, removing the culvert and regrading the right-of-way. Additional work to <br />still be accomplished will include regarding the upper portion of the road to blend with <br />the natural topography and reseeding the area. It is expected that these continuing <br />requirements will be completed this fall. <br />Response 5. -The slope gradient was inadvertently changed to 60°dueto trigonometric <br />error 1:5:1 vs. 1:1:5. The approved slope is 1:5:1 and will be labeled as such. <br />A COMPANY OF ENGINEERS AND SCIENTISTS 849 FRONT STREET, SUITE N201 / EUANSTON, WY 82930 / (307) 789.6735 /FAX (307J 789.6746 <br />REXBURG /BOISE /WYOMING / WENATCHEE /SALT LAKE CITY /SACRAMENTO <br />wwwi°rsgren.c°m <br />
The URL can be used to link to this page
Your browser does not support the video tag.