Laserfiche WebLink
,/ <br />d5 ~ STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources p4~co~~ <br />Department of Natural Resources ^~°-~' <br />yc~. <br />1313 Sherman SVeel, Room 818 ' <br />Denver, Colorado 80203 Respo~ s- a to Reclamation Permit Application Consideration x,,876 , <br />Phone (303) 866-3561 <br />FAX (303)8663589 <br />Bill Ritter, Jr. <br />http.f/www.watecstate.co.us REGElVED Governor <br />DATE: February 5, 2007 Harris D. Sherman <br />B .0,5 2001 Executive Director <br />TO: Bob Oswald, Environmental Protection Specialist Hal D. Simpson, P.E. <br />Div' ton Ot Reclamation, Stale Engineer <br />CC: Division 4 Office; District 41 Water Commis~sio~ner Mining and Safety <br />FROM: Cynthia J. Love, Water Resource Enginee~~" _ <br />RE: ,Operator: Nick H. Gray, Gray Pit #2, File No. M-2010/5-012 <br />Section 36, Twp 49N, Rng 8W, N.M. P.M., Montrose County <br />Landowner- Nick H. Gray <br />CONDITIONS FOR APPROVAL <br />^ The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground water must not <br />occur during or after mining operations. <br />^ The proposed operation will consume ground water by ^evaporation, ^dust control, ^reclamation, ^water <br />removed in the mined product, ^processing, ^other: <br />Prior to initiation of these uses of ground water, [he applicant will need to obtain either a gravel pit or other type <br />of well permit, as applicable. Prior to obtaining a permit, an approved water supply plan or decreed plan for <br />augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of [he site and document the <br />locations of all wells within 600 feet mile of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of [he petTnit area or contact this office regarding the <br />600 foot spacing notification hearing process. <br />^ The proposed operation may have potential impact on existing water rights near the project location. Please <br />provide evidence that the proposed project wit! not alter or impact the historic operation of existing water rights. <br />^ The applicant has indicated plans to use other water for: Dust suppression at the petmi[ site. <br />^ Other. <br />COMMENTS: The owner's permitting contact, Timothy M. Scanlon, has provided more detailed information in his <br />April 23, 2005 letter regarding water use at the project site, Contract operators will supply their own water needs from <br />offsite sources by purchasing and hauling in water for dust suppression. The applicant has sufficiently addressed the <br />concerns noted in my March 18, 2005 Response. <br />