North
<br />0 150 300' GOO
<br />SCALE: I" =300'
<br />APPLICANT:
<br />5W TKO JOIKIT VEIJTURE, LLC.
<br />333 WEST HAMPDEKL SUITE 810
<br />EN61_EWOOD, CO 80110
<br />FLOODPLAIN INFORMATION:
<br />FLOODPL A I M I NJFORMAT I ON 15 FROM
<br />FIRM FLOOD I IJSIJRAKIGE RATE MAP,
<br />PAKEL K10. 08026609836, 08026609816,
<br />DATED MA120-4 18, 080
<br />R11
<br />ut
<br />EI /4 GOR,
<br />566.18 -
<br />o
<br />I 0o
<br />6 ❑
<br />0
<br />IO' UNITED
<br />POKER
<br />P EASEMENT
<br />ED
<br />TEMPORARY -
<br />APPROXIHkTF TO •:
<br />PROPERTY TOE Of: SLOPE
<br />' . , I .. •.
<br />TO PROPERTY
<br />i
<br />CJ I
<br />/ SILT /SETTLING POND `
<br />AREA = 11.9 AC. �, BLDG
<br />1 SETBACK 1
<br />50' PROPERTY TO T
<br />LINE SETBACK
<br />�t)ISC.FiHR6E � ��
<br />\TO RIVER OI5GFIAR6E -
<br />TO EXIST ROW
<br />�- APPROXIMATE GL LOCATION
<br />OF 0610,1E 5EEPA6E DITCH TOE OF MINE SLOPE
<br />NOT TO ENCROACH
<br />WITHIN 100' OF 5H 85
<br />R.OA (TYP)
<br />NOTES:
<br />I. AREAS NOT 015TURDED BY CURREIJT MIMIIJ6 AGTIVITIE5 OR UK®ER
<br />RECLAMATION WILL DE MAIUITAIWFJD A5 FARMLAKD, PA5TUPE OR OTHER
<br />SUITABLE COVER CROP UNTIL MININ6 15E&IM5 IN EA04 PHASE.
<br />2. PRIOR TO CONSTRUCTION ALL UTILITY, 6A5 WELL, OIL WELL, f WATER
<br />WELL LOCATIONS MU5T BE VERIFIED.
<br />3. IMTERA141_ MINING HAUL ROAD5 TO BE WATERED ON A RE6UAR
<br />BA5I5 TO C9KMROL DUST.
<br />4. TOP501L E OVER ORDEJJ WILL BE 5E6RE&ATED AK® STOCKPILED
<br />AROUND THE PERIMETER OF THE MIKIIKI6 AREA.
<br />5. TEMPORARY STOCKPILES VARY IN LOCATION AKIO SIZE IN5119E
<br />EACH PHASE.
<br />G. C91JFI6(JRATION OF BATCH PLAKTF5 AKD P9O6E551K16 AREA MAY
<br />G44AKI6E TO COMPLY WITH W015E EMISSION REQUIREMEMT5.
<br />7 C.OKIVEYOPYWAUL ROAD WILL EXTEND IKITO EAU4 PHASE A5 MINING
<br />PR0612ESSES.
<br />B. REFER TO EXI5TIM5 CONDITIONS MAP, SHEET 2 OF 7, FOR
<br />5T UC,TURE OWIJER_HIP.
<br />9. THE TOE OF THE MINE SLOPE 15 DEFINED AS THE COKITACT OF
<br />THE MIKE SLOPE WITH THE TOP OF WEATHERED BEDROCK.
<br />IO.MIKIE EXCAVATION) LIMIT AND MAXIMUM MINE SLOPE TOE CAN
<br />KIOT 15E EKICROAC44ED BY EIT44ER ERO51OKIAL- PROCESSES
<br />(5LOU64iKI6) OR MIUIM6.
<br />11. THE MAXIMUM ALLOWED F_NJGROACHMEKTT OF THE MIKE SLOPE TOE
<br />WITH HIGHWAY 85 R.O.W. 15 100 FEET.
<br />12. THE MAXIMUM ALLOWED Ek"OACA4MEATF OF THE MIKE SLOPE TOE.
<br />WITH THE FULTON LATERAL OR WGR 27 15 '35 FEET.
<br />13. THE MAXIMUM ALLOWED EKK.2OACl4MENT OF THE MME: SLOPE TOE
<br />TO WGR G. WUR G.25, AND WGR 8, FURTHER THAN 1300 FEET FROM
<br />HIGHWAY 85 15 G5 FT.
<br />14. THE OPERATOR WILL MIWIE THE SITE HJ SECTION ABOUT 20-25
<br />A62E5 IN SIZE. AS DEPICTED.
<br />15, THE OPERATOR WILL GOKISTRUCT PERIMETER BERM5 AT THE
<br />BE61KWIN6 OF EACH RESPECTIVE MINIKI6 PHASE. T14E BERMS
<br />SHALL BE SEEDED WITH THE SPECIFIED SEED MIX IKI THE FALL
<br />OR SPRIN6.
<br />IG. THE OPERATOR SHALL IWI5TAI. L IRRI&ATIOkk TREE5 AND SHRUBS
<br />A5 SOON A5 IT 15 FEASIBLE AFTER THE BERM5 HAVE 15EEKI
<br />CONSTRUCTED. PLA IK16 FOR DECIDUOUS TREES SHALL OCCUR
<br />PRIOR TO OCTOBER 15TH AND AFTER MARCH 15TH. PLAKIT'IN6 FOR
<br />EVERGREEN TREE5 SHALL OCUJR PRIOR TO OCTOBER I5T AkV
<br />AFTER MARCH 15TH.
<br />17. _URISDIGTIOKIAI_ WETLANDS WILL KIOT BE DREDGED OR FILLED
<br />PRIOR TO 05TAINIWI6 A 404 PERMIT FROM THE U5 ARMY CORP5
<br />OF EN6IKEER5.
<br />18, PRIOR TO ANY DI5TURBAKrE OUTSIDE THE 5ETTLIWI6 PONDS AND
<br />PROCE551KI6 AREA, THE APPLICANT WILL POST THE ADDITIOKAL
<br />BOND REQUIRED FOR 6OK)5TRUGTION OF THE COMPACTED CLAY
<br />L I KIER.
<br />I 40
<br />O
<br />404 AREA = 19.5 AC.
<br />o
<br />4 PIPES TO DISCHARGE
<br />r WATER TO SILT PONDS
<br />= 6.7 AC.
<br />014 COR,
<br />5E6.18
<br />LEGEND:
<br />WEST LINE
<br />5EI/4, SEG.IB
<br />APPROXIMATE CL LOCATION
<br />OF PORTER 5Eff'A6E DITCH-
<br />PEP-MIT 50U1IMARY
<br />I: 40
<br />0000*44k 00
<br />I
<br />MINIW7J 4
<br />HIGH WALL 444
<br />go '
<br />MIKE SLOPE TOE
<br />APPROXIMATE AT OF 440
<br />REC� YaBL o4 O
<br />/ SILT /SETTLING POND `
<br />AREA = 11.9 AC. �, BLDG
<br />1 SETBACK 1
<br />50' PROPERTY TO T
<br />LINE SETBACK
<br />�t)ISC.FiHR6E � ��
<br />\TO RIVER OI5GFIAR6E -
<br />TO EXIST ROW
<br />�- APPROXIMATE GL LOCATION
<br />OF 0610,1E 5EEPA6E DITCH TOE OF MINE SLOPE
<br />NOT TO ENCROACH
<br />WITHIN 100' OF 5H 85
<br />R.OA (TYP)
<br />NOTES:
<br />I. AREAS NOT 015TURDED BY CURREIJT MIMIIJ6 AGTIVITIE5 OR UK®ER
<br />RECLAMATION WILL DE MAIUITAIWFJD A5 FARMLAKD, PA5TUPE OR OTHER
<br />SUITABLE COVER CROP UNTIL MININ6 15E&IM5 IN EA04 PHASE.
<br />2. PRIOR TO CONSTRUCTION ALL UTILITY, 6A5 WELL, OIL WELL, f WATER
<br />WELL LOCATIONS MU5T BE VERIFIED.
<br />3. IMTERA141_ MINING HAUL ROAD5 TO BE WATERED ON A RE6UAR
<br />BA5I5 TO C9KMROL DUST.
<br />4. TOP501L E OVER ORDEJJ WILL BE 5E6RE&ATED AK® STOCKPILED
<br />AROUND THE PERIMETER OF THE MIKIIKI6 AREA.
<br />5. TEMPORARY STOCKPILES VARY IN LOCATION AKIO SIZE IN5119E
<br />EACH PHASE.
<br />G. C91JFI6(JRATION OF BATCH PLAKTF5 AKD P9O6E551K16 AREA MAY
<br />G44AKI6E TO COMPLY WITH W015E EMISSION REQUIREMEMT5.
<br />7 C.OKIVEYOPYWAUL ROAD WILL EXTEND IKITO EAU4 PHASE A5 MINING
<br />PR0612ESSES.
<br />B. REFER TO EXI5TIM5 CONDITIONS MAP, SHEET 2 OF 7, FOR
<br />5T UC,TURE OWIJER_HIP.
<br />9. THE TOE OF THE MINE SLOPE 15 DEFINED AS THE COKITACT OF
<br />THE MIKE SLOPE WITH THE TOP OF WEATHERED BEDROCK.
<br />IO.MIKIE EXCAVATION) LIMIT AND MAXIMUM MINE SLOPE TOE CAN
<br />KIOT 15E EKICROAC44ED BY EIT44ER ERO51OKIAL- PROCESSES
<br />(5LOU64iKI6) OR MIUIM6.
<br />11. THE MAXIMUM ALLOWED F_NJGROACHMEKTT OF THE MIKE SLOPE TOE
<br />WITH HIGHWAY 85 R.O.W. 15 100 FEET.
<br />12. THE MAXIMUM ALLOWED Ek"OACA4MEATF OF THE MIKE SLOPE TOE.
<br />WITH THE FULTON LATERAL OR WGR 27 15 '35 FEET.
<br />13. THE MAXIMUM ALLOWED EKK.2OACl4MENT OF THE MME: SLOPE TOE
<br />TO WGR G. WUR G.25, AND WGR 8, FURTHER THAN 1300 FEET FROM
<br />HIGHWAY 85 15 G5 FT.
<br />14. THE OPERATOR WILL MIWIE THE SITE HJ SECTION ABOUT 20-25
<br />A62E5 IN SIZE. AS DEPICTED.
<br />15, THE OPERATOR WILL GOKISTRUCT PERIMETER BERM5 AT THE
<br />BE61KWIN6 OF EACH RESPECTIVE MINIKI6 PHASE. T14E BERMS
<br />SHALL BE SEEDED WITH THE SPECIFIED SEED MIX IKI THE FALL
<br />OR SPRIN6.
<br />IG. THE OPERATOR SHALL IWI5TAI. L IRRI&ATIOkk TREE5 AND SHRUBS
<br />A5 SOON A5 IT 15 FEASIBLE AFTER THE BERM5 HAVE 15EEKI
<br />CONSTRUCTED. PLA IK16 FOR DECIDUOUS TREES SHALL OCCUR
<br />PRIOR TO OCTOBER 15TH AND AFTER MARCH 15TH. PLAKIT'IN6 FOR
<br />EVERGREEN TREE5 SHALL OCUJR PRIOR TO OCTOBER I5T AkV
<br />AFTER MARCH 15TH.
<br />17. _URISDIGTIOKIAI_ WETLANDS WILL KIOT BE DREDGED OR FILLED
<br />PRIOR TO 05TAINIWI6 A 404 PERMIT FROM THE U5 ARMY CORP5
<br />OF EN6IKEER5.
<br />18, PRIOR TO ANY DI5TURBAKrE OUTSIDE THE 5ETTLIWI6 PONDS AND
<br />PROCE551KI6 AREA, THE APPLICANT WILL POST THE ADDITIOKAL
<br />BOND REQUIRED FOR 6OK)5TRUGTION OF THE COMPACTED CLAY
<br />L I KIER.
<br />I 40
<br />O
<br />404 AREA = 19.5 AC.
<br />o
<br />4 PIPES TO DISCHARGE
<br />r WATER TO SILT PONDS
<br />= 6.7 AC.
<br />014 COR,
<br />5E6.18
<br />LEGEND:
<br />WEST LINE
<br />5EI/4, SEG.IB
<br />APPROXIMATE CL LOCATION
<br />OF PORTER 5Eff'A6E DITCH-
<br />PERMIT r
<br />EAST LINE DO"��
<br />51/16 COR, SEI /4, 5fiG. 18 15' T ELCO ■
<br />SEC. 18 ■ ■
<br />PEP-MIT 50U1IMARY
<br />MIKE EXGAVAT I ON 5OUKIDARY
<br />NO.
<br />TOE OF
<br />12
<br />MIKE SLOPE TOE
<br />TOE OF MINE
<br />MINING PHA5E LINES
<br />•
<br />100 YR. FLOODPLAIM
<br />NOT TO ENGRDACH
<br />EXI5TIKI6 WATER
<br />- -- -
<br />EX I5T I N6 2' CAKITOURS
<br />Qf
<br />EX15TIK16 POWER POLE
<br />E
<br />EXISTING OVERHEAD
<br />THE FULTON
<br />POWER
<br />6
<br />EXISTIKI6 GAS LIKE
<br />IF 6A5 LINE 15 -
<br />6AS MARKER
<br />©
<br />PETROLEUM WELL
<br />❑
<br />GAS /OIL EQUIPMENT
<br />ED
<br />TELEPHONE PEDESTAL
<br />X-
<br />EXI5TIKI6 FEKIGE
<br />AREA = 20.7AC.
<br />EXI5TIKI6 TREE
<br />D
<br />EXISTING STRUCTURES
<br />OMIMKI6
<br />SEQUENCE
<br />'®
<br />TOP501L BERM
<br />®
<br />OVEIRIN112DIEN STOCKPILE
<br />�ovoo
<br />HAUL ROADIC9KIVEY012
<br />PROPOSED AC61E55
<br />APPROXIMATE LOCATION
<br />O
<br />OF 6ROUKIDWATER REC44AR6E
<br />WELL5
<br />DRAIKA&E 5WALE
<br />PERMIT r
<br />EAST LINE DO"��
<br />51/16 COR, SEI /4, 5fiG. 18 15' T ELCO ■
<br />SEC. 18 ■ ■
<br />11
<br />II�
<br />6A5 WEJ_ 40"
<br />161' 6A5 YELL o
<br />SETBAcK To roE 444
<br />110' 6A5 Y>aL�o4
<br />� SETBAC.K „o
<br />40" I:IITYPJ
<br />4o MININ6
<br />OHIGH WALL I
<br />AREA 613.8 AC.
<br />1
<br />TOE OF MINE SLOPE
<br />NOT TO EHGROAGH
<br />OMTHIN 75' OF WGR 8
<br />rj- 4 UTILITIES (TYP)
<br />AREA = 18.1 AC.
<br />Ti' SETBACK FROM
<br />TOE OF SLOPE
<br />TO PROPERTY LINE
<br />1:1 N6 )
<br />- MINING - - 25' PROPERTY -
<br />HI6H WALL LINE 5ETBAC.K
<br />EXST.-ROW
<br />4 PIPES TO
<br />Vt5C4VA5E 0I5C IAR6E
<br />>-'TO RIVER WATER TO
<br />VU HISTORIC SILT PONDS
<br />DRAINAGE
<br />- - EASEMENT
<br />61:11L-00�r7Ci /D7T�l_`
<br />`-fX 1 TE CL LOGATION
<br />APPROXIMATE
<br />• • OF /
<br />`
<br />°• ' • DITGH
<br />r-
<br />,
<br />5E COP, • -/•
<br />, ■
<br />' ii /iii iI i /// %// // i iiiiiil i . i /i / / /// % % % / / / / // // / // ii.���' i/ // i �: • s�
<br />/ "i /
<br />To MINE 0
<br />NOT EN AC 30'6A5L[NE H16H KALL REMOVE
<br />FULTON . FROM ., MIER HTHIN q5'OF THE ,
<br />• /:-f
<br />I
<br />0 SETBACK (t AREA 18.7 AC. AREA 17.7 AC. b5'5ET5ACK FROM r EWROA"
<br />C7A5LINE TO TOE FOR PROCE59% -6 OF HGR 6.25 4
<br />® \ y
<br />•• ,
<br />/• �:r �4
<br />__•
<br />MININ65 CONVEYOR/ CONCRETE AND ASPHALT CONVEYOR
<br />H1644 KALL BATCH PLANTS GRO95IN6
<br />158'6A5 HELL AREA = 23-2 AC.
<br />• • •• \
<br />r
<br />SETBACK TO / \ PELL
<br />SETBACK
<br />! � SLOPE
<br />I ' I , j
<br />/ SETBACK
<br />1 4 PIPES To
<br />J
<br />® 10
<br />AREA = 18.5 AC. AREA = 19.6 AC.
<br />APPROXIMATE
<br />TOE OF SLOPE
<br />LINE
<br />ALL TREES ALONG 5H85 SHALL BE PLANTED
<br />.I ON 5W TKO JOINT VENTURE PROPERTY 50
<br />THAT THE DRIPLINE OF THE TREE`i DOES
<br />W4 COP, EXTEND INTO THE COOT RI644T-OF44AY AT
<br />5EGJ8 MATURITY (TYP).
<br />I
<br />IOfJ'
<br />5E7
<br />BOSTIM6 6RADE
<br />6ROMMATFR.i.. - - ... _
<br />TABLE �...�
<br />MINE SLOPE TOE
<br />DEWATERIKI6 TRENCH, BOTTOM OF
<br />POSITIVE DRAIKA6E TO 6RAVEL RESERVE
<br />SUMP
<br />TYPICAL - TOPSOIL STOCKPILE AT EDGE OF MINING AREAS GROSS SECTION
<br />NTT TO SCALE
<br />DISC+LNR6E
<br />WATER TO
<br />SILT PONDS
<br />'
<br />70' SETBACK FROM
<br />PROPERTY LINE TO
<br />NO.
<br />TOE OF
<br />12
<br />©
<br />TOE OF MINE
<br />AREA = 14.0 AC.
<br />•
<br />SLOPE NOT TO
<br />NOT TO ENGRDACH
<br />°
<br />ENCROACH
<br />�.
<br />.. T. _.. _.. _....�
<br />WITHIN 45'OF
<br />4
<br />- - -
<br />THE FULTON
<br />5
<br />I:I (7YPJ
<br />DITCH LATERAL.
<br />IF 6A5 LINE 15 -
<br />- - - - - - -
<br />(T1'P)
<br />/
<br />TEMPORARY H 6UHI WALL
<br />BERI
<br />NAME / SETBACK DIST
<br />I
<br />O
<br />INO;FA5ED
<br />ACCORDINGLY
<br />I
<br />AREA = 20.7AC.
<br />4/15/05
<br />T LIT5
<br />1
<br />10
<br />p0000
<br />10 /12/05
<br />400
<br />1
<br />„O
<br />11
<br />II�
<br />6A5 WEJ_ 40"
<br />161' 6A5 YELL o
<br />SETBAcK To roE 444
<br />110' 6A5 Y>aL�o4
<br />� SETBAC.K „o
<br />40" I:IITYPJ
<br />4o MININ6
<br />OHIGH WALL I
<br />AREA 613.8 AC.
<br />1
<br />TOE OF MINE SLOPE
<br />NOT TO EHGROAGH
<br />OMTHIN 75' OF WGR 8
<br />rj- 4 UTILITIES (TYP)
<br />AREA = 18.1 AC.
<br />Ti' SETBACK FROM
<br />TOE OF SLOPE
<br />TO PROPERTY LINE
<br />1:1 N6 )
<br />- MINING - - 25' PROPERTY -
<br />HI6H WALL LINE 5ETBAC.K
<br />EXST.-ROW
<br />4 PIPES TO
<br />Vt5C4VA5E 0I5C IAR6E
<br />>-'TO RIVER WATER TO
<br />VU HISTORIC SILT PONDS
<br />DRAINAGE
<br />- - EASEMENT
<br />61:11L-00�r7Ci /D7T�l_`
<br />`-fX 1 TE CL LOGATION
<br />APPROXIMATE
<br />• • OF /
<br />`
<br />°• ' • DITGH
<br />r-
<br />,
<br />5E COP, • -/•
<br />, ■
<br />' ii /iii iI i /// %// // i iiiiiil i . i /i / / /// % % % / / / / // // / // ii.���' i/ // i �: • s�
<br />/ "i /
<br />To MINE 0
<br />NOT EN AC 30'6A5L[NE H16H KALL REMOVE
<br />FULTON . FROM ., MIER HTHIN q5'OF THE ,
<br />• /:-f
<br />I
<br />0 SETBACK (t AREA 18.7 AC. AREA 17.7 AC. b5'5ET5ACK FROM r EWROA"
<br />C7A5LINE TO TOE FOR PROCE59% -6 OF HGR 6.25 4
<br />® \ y
<br />•• ,
<br />/• �:r �4
<br />__•
<br />MININ65 CONVEYOR/ CONCRETE AND ASPHALT CONVEYOR
<br />H1644 KALL BATCH PLANTS GRO95IN6
<br />158'6A5 HELL AREA = 23-2 AC.
<br />• • •• \
<br />r
<br />SETBACK TO / \ PELL
<br />SETBACK
<br />! � SLOPE
<br />I ' I , j
<br />/ SETBACK
<br />1 4 PIPES To
<br />J
<br />® 10
<br />AREA = 18.5 AC. AREA = 19.6 AC.
<br />APPROXIMATE
<br />TOE OF SLOPE
<br />LINE
<br />ALL TREES ALONG 5H85 SHALL BE PLANTED
<br />.I ON 5W TKO JOINT VENTURE PROPERTY 50
<br />THAT THE DRIPLINE OF THE TREE`i DOES
<br />W4 COP, EXTEND INTO THE COOT RI644T-OF44AY AT
<br />5EGJ8 MATURITY (TYP).
<br />I
<br />IOfJ'
<br />5E7
<br />BOSTIM6 6RADE
<br />6ROMMATFR.i.. - - ... _
<br />TABLE �...�
<br />MINE SLOPE TOE
<br />DEWATERIKI6 TRENCH, BOTTOM OF
<br />POSITIVE DRAIKA6E TO 6RAVEL RESERVE
<br />SUMP
<br />TYPICAL - TOPSOIL STOCKPILE AT EDGE OF MINING AREAS GROSS SECTION
<br />NTT TO SCALE
<br />DISC+LNR6E
<br />WATER TO
<br />SILT PONDS
<br />'
<br />70' SETBACK FROM
<br />PROPERTY LINE TO
<br />NO.
<br />TOE OF
<br />12
<br />I4
<br />AREA = 14.4 AC.
<br />AREA = 14.0 AC.
<br />TOE OF MINE SLOPE
<br />AR
<br />NOT TO ENGRDACH
<br />Z.
<br />MTHM 100' OF 5H 85
<br />`J SETBACK
<br />J
<br />ROA MP)
<br />MININ6
<br />4
<br />1416H WALL
<br />DF
<br />5
<br />HI Y 65
<br />SR
<br />IF 6A5 LINE 15 -
<br />- - - - - - -
<br />RELOCATED ALON6
<br />KF
<br />PERIMETER, MINING
<br />NAME / SETBACK DIST
<br />5ETBAGK5 MUST BE
<br />KF
<br />INO;FA5ED
<br />ACCORDINGLY
<br />8
<br />9
<br />5 MIN
<br />I �-
<br />EXI5TIN6 6RADE
<br />SEED WITH SPECIFIED
<br />KATIVE GRASS MIX AID E
<br />WATER TO ESTABLISH
<br />3 MIN
<br />I
<br />TYPICAL - TEMPORARY MINING BERM CROSS SECTION
<br />NOT TO SCALE
<br />-TEMPORARY BERM I
<br />PIPES TO r
<br />KATER TO SILT
<br />..
<br />/
<br />• _
<br />AREA 15 RELOrATEV
<br />6A5
<br />RAW
<br />MATERIALS
<br />IN
<br />....,
<br />I �
<br />1 ;
<br />r
<br />O ■
<br />i
<br />����� /// • it • / • -
<br />51/4 _ S� C40& T
<br />Do \
<br />o a4
<br />0
<br />I
<br />I
<br />I
<br />I
<br />II
<br />I� I
<br />I
<br />PROCESSING PLANT AREA DETAIL
<br />NOTE: WT TO _GALE
<br />13 2005
<br />APPROXIMA
<br />LOCATION G
<br />G 1 V I L RES0UR6E5, LL6. 15 KIOT RE5POKI515LE FOR SAFETY, I KI, ON, OR
<br />ABOUT THE PROJECT 51 TE, NOR FOR GOMPL I AKIGE 5Y T4-4E APPROPR I ATE
<br />PARTY OF AK1Y REGULATIONS THERETO.
<br />THESE MAPS WERE PREPARED 5Y CIVIL RESOURCES, LL6. IM
<br />CAOPERATIOKI WITH 5W TKO JOIKIT VEK)TL92F- LL6. 5W TKO JOINT
<br />VEKTTURE, LL6. WILL KEEP THE D I V 151 ON OF M I KERAL5 AND GEOLOGY
<br />IKIFORMED OF ANY 04AKI&E5 TO THE MINING OR RECLAMATION PLAKIS
<br />THROUGH AKUJAL REPORTS AKV FILE TEEC44NI6AL REV1510N5 AND
<br />AMENDMENT APPLICATIONS KE6E55ARY THROUGHOUT THE LIFE OF
<br />THE MIKE.
<br />•,,�� 10/12/05
<br />DAKttA ORTIZ DATE
<br />CIVIL RE50URGE5, LL6.
<br />Permit #:M.,Tnnq MH Confidental ?:
<br />Class .'2E Sin.N Type-Seq.: 7-Q - I
<br />From:5 TKr),n , V9 rf OF To. '_Z fMc
<br />Doc. Name: m, 0. ,' �
<br />Doc. Date (if no date stamp)
<br />Specialist:
<br />REVISIONS
<br />LUPTON LAKES RESOURCE,
<br />FT. LUPTON SPECIAL USE PERMIT AND
<br />MLRB 112 RECLAMATION PERMIT M- 2004 -078
<br />MINING PLAN
<br />5A TKO JOINT VENTURE, LLC
<br />NO.
<br />DESCRIPTION
<br />DATE
<br />BY
<br />1
<br />REVISIONS PER SW TKO
<br />11/
<br />AR
<br />2
<br />NAME CHANGE PER DMG i2/2a/04
<br />0/04
<br />DF
<br />3
<br />PERMIT N0. CHANGED 1/27/05
<br />DF
<br />4
<br />PROCESSING AREA MOVED 1/27/05
<br />DF
<br />5
<br />FT LUPTON SPECIAL USE '3/24/05
<br />SR
<br />6
<br />DMG ADEQUACY RESPONSE
<br />3/28/05
<br />KF
<br />7
<br />NAME / SETBACK DIST
<br />4/8/05
<br />KF
<br />451 Oak Street, Suite 209
<br />CIVIL R E S" �U R C E S LLC P.O. Box 680 Frederick, CO 80530
<br />• 303 833 1416 (p) 303 833 2850 (f]
<br />DESIGNED BY: DO JOB NO. DWG:
<br />ARR - DATE: Oct. 2005 DMG Tech Rev 1 10- 12- 05.dwg
<br />DRAWN BY: SCALE: AS NOTED SHEET: O�
<br />CHECKED BY: DO
<br />8
<br />9
<br />ADEQUACY RESPONSE
<br />TECHNICAL REVISION NO. 1
<br />4/15/05
<br />T LIT5
<br />KF
<br />KF
<br />10
<br />REVISED NOTE 18
<br />10 /12/05
<br />KF
<br />Permit #:M.,Tnnq MH Confidental ?:
<br />Class .'2E Sin.N Type-Seq.: 7-Q - I
<br />From:5 TKr),n , V9 rf OF To. '_Z fMc
<br />Doc. Name: m, 0. ,' �
<br />Doc. Date (if no date stamp)
<br />Specialist:
<br />
|