Laserfiche WebLink
r <br />~ TWBNTYM166 IIIIII'lllll"IIIII <br />sss Twentymile Coal Corporation <br />7~ COAI. COMPANY 29515 Routf County Road # 27 <br />A Cyprus Ama: Company Oak Creek, Colorado 80467 <br />970-879-3800 <br />April 11, 1997 <br />Janet Binns RECEIVED <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 AF'H 1 ~ 1997 <br />Denver, Colorado 80203 <br />Division of Minerals g Geology <br />RE: TR 26, Midterm Review Adequacy Response <br />Permit No. C-82-056 <br />Dear Ms. Binns: <br />This will serve to provide the Division direction as to the handling of the <br />material that TCC's consultant, TuttleApplegate, Inc., will be hand delivering <br />today. The materials the Division will be receiving are as follows: <br />• Revised Map 31, Postmining Topography, <br />• Revised Map 25, Surface Area Cross-Sections <br />• SedCad Documentation for permanent diversions and lower PG 2-1 <br />drainage <br />• Cut and fill discussion <br />The revised maps, both postmining topography and surface area cross <br />sections, have utilized the latest mapping that was completed last fall. The <br />final topography has been modified to address the drainage concerns raised by <br />the Division. The location of the permanent diversions are shown on Map 31. <br />It was determined that constructing permanent diversions is more visually <br />appealing than riprapping segments of the drainage coming over the face of the <br />slope. Also, the construction of the diversions and final grading of the portal <br />azea assures all this disturbed drainage is routed to Pond D. <br />The SedCad demonstration is provided as backup for the design of the <br />diversions and the lower segment of PG 2-1. Both the maps and SedCad <br />demonstrations are certified by a registered professional engineer. <br />Finally, text is provided by the consultant to address the Division's bonding <br />concerns. The end result is that the proposed postmining topography can be <br />achieved with the material in the adjacent spoil and pad areas for the shop and <br />ofTice facilities. It appears the bond is sufficient to cover these activities. <br />Janet, I will hold off forwazding this information to the other agencies until I <br />have received the Division's comments on the submittal. I'm optimistic that <br />this should address all of the outstanding issues. Thanks for working through <br />this with us. I believe the final product justified the wait on the updated <br />mapping. <br />