Laserfiche WebLink
COLORADO NINED LAND RECLAMATION DIVISION <br />PICKUP TRUCK COST DATA NORKSHEEi Sheet 1 of 2 sheets <br />REYISIDN DATE: 6/91 <br />• WOAKSHEEi FILENAME: PIKUP-iK.NNI <br />NACHINE DESCRIPTION: PICKUP TRUCK - GASOLINE, 4x4, 3/4 TON, 13DHP <br />REFERENCES: 1) COST REFERENCE GUIDE <br />2) CONTAAC10A5 EQUIPMENT COST GUIDE <br />3) COLORADO CONTRACTORS ASSOCIATION <br />NAGE RATE SCHEDULE <br />COST ADJUSTNENT FACTORS BASE VALUE ADJUSFED VALUE <br />Acquisition Cost: (15,520.00 511,486.99 <br />Economic Life Hours: 7000 9000 <br />Annual Use Hours: 2112 2000 <br />Nech. Labor Cost-ZOne l: 524.78 521.95 <br />-Zone 2: 524.18 321.95 <br />Fue] Cost per gal.: 51.14 51.14 <br />Lube Cost: 50.38 50.38 <br />lire Life Hours: 2000 1650 <br />lire Purchase Price: 5520.00 4388.00 <br /> --- BASE DWNERSHIP 6 OVERHAUL COSTS ----;- ---------------BASE OPERATING COSTS --- ---- ---- <br />BASIC MODEL L ATTACHMENTS DESCRIPTION ;DEPRECIATION OHD/CFC LABOR PAAiS; LABOR PARTS FUEL LUKE TIRES G.E .C. <br />Machine Model No. :3/4 TON 4x4 PICKUP 52.05 50.68 50.32 50.40 40.40 50.34 32.82 51.26 50.26 40 .00 <br />Attachment tll NJA 50.00 50.00 50.00 50.00 50.00 50.00 50.00 50.60 50.00 50 .06 <br />Attachment tl2 N/A 50.06 50.00 50.00 50.00 50.00 40.00 SD,00 50.00 50.00 50 .00 <br />Attachment tl3 NJA SO.OD 50.00 50.00 40.00 SO.DO 50.00 SO,OD SO.OD SO.OD SO .DD <br />BASE COST SUBTOTALS <br />COST ADJUSTMENT FACTORS <br />Acquisiticn Cost <br />Economic Life <br />Annual Usage <br />Double shifts <br />Triple Shifts <br />Mechanic Cost - Zone l <br />- Zone 2 <br />Fuel/LUDe/fire Cost <br />(ruck Util. - Zone 1 <br />- Zone 2 <br />ADJUSTED COST SUBTOTALS <br /> <br />52.05 50.68 50.32 40.40 50.40 50.34 52.82 SL.26 50.26 50.00 <br /> -- ADJUSTED ONNERSHIP 8 OVERHAUL COSTS -;- -------- -- ADJUSTED OPERATING COSTS --- -------- <br />FACTOR VALUE ; DEPRECIATION OHD/CFC LABOR PARTS; LABOR PARTS FUEL LOBE TIRES G.E.C. <br />0.1401 41.52 N(A NfA NJA NJA N/A N(A N(A NJA NJA <br />0.7778 51.18 NJA 40.25 40.31 50.31 50.26 NJA HJA NJA N/A <br />1.0560 51.60 50.72 NJA N/A NJA N/A N/A N/A N/A N/A <br />.750depr.-.500ohd 51.20 40.36 N/A N/A N/A N/A N/A N/A N/A N/A <br />.667depr.-.333ohd 41.01 40.24 N/A N(A NJA N/A N/A N(A N(A N/A <br />0.8860 N/p N/A 50.22 N/A 50.28 N/A N/A N/A N/A N/A <br />0.8860 N/A N/A 50.22 N/A 50.28 NJA NJA N/A N/A N(A <br />Variable NJA NJA NJA NJA NJA NJA 52.82 31.26 50.32 50.00 <br />100.002 N/A N/A 50.22 50.31 50.28 50.26 52.82 51.26 50.32 50.00 <br />100.001 NJA N/A 50.22 50.31 50.28 50.26 52.82 51.26 50.32 50.00 <br />-S.SHiFT -LONE A: 51.60 40.12 50.22 50.31 40.28 50.26 52.82 51.26 50,32 50.00 <br />-ZONE 8: 51.60 50.72 50.22 40.31 40.28 50.26 52.82 41.26 50.32 50.00 <br />-D.SHIF15-20NE A: 51.20 40.36 50.22 50.31 50.28 50.26 42.82 51.26 50.32 40.00 <br />-LONE B: 31.20 50.36 50.22 50.31 40.28 50.26 52.82 51.26 50.32 40.00 <br />-T.SHIFTS-ZONE A: 51.07 50.24 50.22 40,31 50.28 50,26 52.82 51.26 50.32 50.00 <br />-ZONE B: 41.07 50.24 40,22 50.31 50.28 40.26 52.82 51.26 50.32 50.00 <br />