Laserfiche WebLink
III IIIIIIIIIIIIIIII <br />STATE OF COLCJI~yU <br />DIVISION OF MINERALS AND GEOLOGY <br />Dnpanmcnl of Nal ural Resuurces <br />I f I S Sherman 51.. Ruum ? I S <br /> <br />Dcnvcr. Calumdu AO'_03 II~~~ <br /> <br />Phnnc: 111111 8hh~35h7 I <br />FA%: (411 11 851-81 06 <br /> DEPARTMEfvT OF <br /> NATURAL <br /> RESOURCES <br /> Roy Romer <br /> Goaernor <br /> lames 5. Lochheul <br /> E.ecwive Dnector <br /> <br />Date: August 4, 1997 ht¢hael B. Lung <br />Diva+inn Oneaar <br />To: David Berry <br />From: Joe Dudash ~ t11 1J <br />Re: Workload Assignment Request, Phase One and Two Bond Release, Trapper <br />Mine, Permit No. C-81-010, Trapper Mining Inc. <br />I am requesting assistance in the review of a portion of Trapper Mine's Phase One and Two bond <br />release submittal. The request involves the evaluation of revegetation success for Phase Two. <br />Trapper's submittal is contained in two volumes per set. I have two sets in my office. Tom K. has <br />Trapper's permit application in his office. If any other information is needed, please let me know. <br />Thanks! <br />C:\wp61 \trapper\vegmemo 1 <br />