Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 8643567 <br />FAX: (303) 832-8106 <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />-- &- <br />SAFETY <br /> <br />Interoffice MEMORANDUM ,, ;~~ <br /><~~'t Bill Rltler, Jr. <br /> Governor <br /> <br />to: <br />Jim Stark (also by e-mail) Harris D. Sherman <br />Executive Director <br />cc: Mike Boulay, Kent Gorham an Mathews, Sandy Brown, Dan Hernandera~~w. cottony <br />mail) Division Director <br /> <br />from: <br />Byron G. Walker Natural Resource Trustee <br />subject: Colowyo PR-02 Responses - Fourth Submittal <br />date: Apri14, 2007 <br />This memorandum is in response to your oral request to review the latest response. These <br />comments are provided without the benefit of a site visit. They are derived from a review of the <br />materials submitted there-under, sections of the earlier revision submittals, and the current Permit <br />Application Package (PAP) as referenced. <br />Not checked was response to a comment in my preceding review as follows. I did not find an <br />added item number for it in the response. <br />Volumes 12, 13 and 14 have been added for information regarding the South Taylor/Lower <br />Wilson activities. Please provide site-specific references to those parts of Volumes 1 through I1 <br />that also apply to such activities. <br />Item 39. The response is accepted. The response is in compliance with the rules. See page Rule 2 <br />Page 97, 3/30/07 and Rule 4, Page 2, 3/30/07 for the text with regard to the sediment ponds <br />access road, and Map25B, 3/28/07. In the construction notes on Map 25B is the notation that No <br />topsoil will be removed prior to surfacing. A variance for topsoil removal from the upgrading <br />(permanent gravel overlay) of this existing two-track dirt road is warranted as provided for under <br />Rule 4.06.2(a)(ii). <br />Item 67. The response is accepted. The response is in compliance with the rules. See page Rule 4, <br />Page 20, 3/30/07. Additional interceptor ditches above the fills are shown on Map 41 A, <br />03/23/07. <br />Item 68. The response is accepted. The response adequately demonstrates compliance with the <br />applicable rules for temporary overburden storage. Storage areas are the best available. <br />Item 105. The response is accepted. See Item 39. <br />Item 116. Defer to the cost estimator. <br />Office of Office of <br />Mined Land Reclamation Denver Grand Junction Durango Active and Inactive Mines <br />